Figure 21.
Proper lifting of the airside economizer
(top) and airside economizer option (bottom)
Spreader
Bar
Strap
Lifting
Cable with
spreader bar
C-Channel
Hanging Bracket
Water Piping
Condenser Connections
W
WA
AR
RN
NIIN
NG
G
H
Hiig
gh
h P
Prre
essssu
urre
e W
Wa
atte
err!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y,, a
an
nd
d e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e..
P
Prro
ov
viid
de
e rre
elliie
eff v
va
allv
ve
e o
on
n ssy
ysstte
em
m w
wa
atte
err p
piip
piin
ng
g tto
o
p
prre
ev
ve
en
ntt iin
nsstta
an
ntta
an
ne
eo
ou
uss rre
elle
ea
asse
e o
off h
hiig
gh
h p
prre
essssu
urre
e
w
wa
atte
err..
N
NO
OT
TIIC
CE
E
P
Prro
op
pe
err W
Wa
atte
err T
Trre
ea
attm
me
en
ntt R
Re
eq
qu
uiirre
ed
d!!
T
Th
he
e u
usse
e o
off u
un
nttrre
ea
atte
ed
d o
orr iim
mp
prro
op
pe
errlly
y ttrre
ea
atte
ed
d w
wa
atte
err
cco
ou
ulld
d rre
essu
ulltt iin
n sscca
alliin
ng
g,, e
erro
ossiio
on
n,, cco
orrrro
ossiio
on
n,, a
allg
ga
ae
e o
orr
sslliim
me
e..
U
Usse
e tth
he
e sse
errv
viicce
ess o
off a
a q
qu
ua
alliiffiie
ed
d w
wa
atte
err ttrre
ea
attm
me
en
ntt
ssp
pe
ecciia
alliisstt tto
o d
de
ette
errm
miin
ne
e w
wh
ha
att w
wa
atte
err ttrre
ea
attm
me
en
ntt,, iiff
a
an
ny
y,, iiss rre
eq
qu
uiirre
ed
d.. T
Trra
an
ne
e a
assssu
um
me
ess n
no
o rre
essp
po
on
nssiib
biilliitty
y
ffo
orr e
eq
qu
uiip
pm
me
en
ntt ffa
aiillu
urre
ess w
wh
hiicch
h rre
essu
ulltt ffrro
om
m u
un
nttrre
ea
atte
ed
d
o
orr iim
mp
prro
op
pe
errlly
y ttrre
ea
atte
ed
d w
wa
atte
err,, o
orr ssa
alliin
ne
e o
orr b
brra
acckkiissh
h
w
wa
atte
err..
Condenser water piping knockouts are in the lower left
end panel. If necessary, remove insulation to gain
access. All field-installed piping must conform to
applicable local, state, and federal codes. To complete
condenser water connections follow the procedure
below.
N
No
otte
e:: Four (4) condenser waterline drain plugs ship in
a bag in the left end of the unit. The installer
must field install these four plugs using pipe
thread sealer. An additional plug is provided for
units with a waterside economizer.
1. Install the vent plugs in the economizer coil headers
and condenser manifolds. See These plugs ship in a
bag with the condenser drain plugs.
2. Attach the water supply line to the inlet connection,
and the return line to the outlet connection.
Entering and leaving water connections for all
condensers are factory manifolded and require only
single connections for entering and leaving water. If
the unit has a waterside economizer and/or control
valves, the factory pipes between these
components.
3. If using a cooling tower, refer to for a typical piping
circuit from the unit.
4. Ensure the water pressure to the unit does not
exceed 400 psig.
N
No
otte
e:: To prevent water pump damage, design system
piping to provide relief when using energy
saving waterside economizer valves.
Figure 22.
Economizer coil vent and condenser
cleanout/drain plugs.
Condensate Drain Connections
The condensate drain is internally trapped. Condensate
drain connections are on the right side of the unit.
Connect condensate drain piping to the 1-1/4” NPT
female fitting, using at least 7/8" OD copper or 3/4" OD
iron pipe. Pitch the condensate line downward a
Содержание IntelliPak SCRF 25
Страница 117: ...SCXF SVX01Q EN 117 N No ot te es s...
Страница 118: ...118 SCXF SVX01Q EN N No ot te es s...
Страница 119: ...SCXF SVX01Q EN 119 N No ot te es s...