Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . 34
Trouble Analysis . . . . . . . . . . . . . . . . . . . . . . . 41
Appendix A - Fan Arrangement . . . . . . . . . . . 44
Appendix B - Filter Layout & Quantity . . . . . . 45
Typical Motor Wiring Diagram . . . . . . . . . . . 51
Service Light / Door Switch Wiring . . . . . . . . 52
Safety Recommendation, Maintenance
Contract and Training . . . . . . . . . . . . . . . . . . 55
Pre-Start Up Checklist . . . . . . . . . . . . . . . . . . 56
Table of Contents
Foreword
Warranty
Unit Description
Model Number Description
Nameplate
Delivery Check
Resolving Shipping Damage
Outdoor Storage
Rigging and Handling
Off Loading
Moving to Position On Site
Forklift Truck
Roller Movement
LH/RH Convention
Foundation
Erection
Duct Connections
External Connection
Frame to Frame Connection
Panel to Frame Connection
Panelling
Breakpoint Joint CLCPEURO XP
CKD at Jobsite CLCPEURO XP
Vertical Unit/Final Filter/Damper Joining
Removing & Replacing Motor/Removing
Shipping Bracket
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
General Information . . . . . . . . . . . . . . . . . . . . 5
Receiving. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Rigging and Handling . . . . . . . . . . . . . . . . . . . 8
Unit Placement and Assembly . . . . . . . . . . . 11
Assembly and Installation . . . . . . . . . . . . . . 13
Piping and Connection . . . . . . . . . . . . . . 26
Start-up Procedures
Periodic Maintenance Checklist
Maintenance Plan
General
Pulley and Belt
Factory Installed VFD TR200 Wiring & Setting
4
Содержание CLCP Euro 25
Страница 16: ...Assembly Installation CLCP EURO 50 Breakpoint Frame to Frame 16 CLCPEURO 50 Break Point Frame to Frame Joining...
Страница 17: ...17 Assembly Installation CLCP EURO 50 Breakpoint Panel to Frame CLCPEURO 50 Break Point Panel to Frame Joining...
Страница 18: ...Assembly Installation CLCP EURO CLCP EURO XP Paneling 18...
Страница 22: ...Assembly Installation CLCP EURO XP CKD At Jobsite 22...
Страница 23: ...23 Assembly Installation CLCP...
Страница 24: ...Assembly Installation CLCP 24...
Страница 40: ...Maintenance 40 Figure 20 Belt Tension Measurement...
Страница 42: ...Trouble Analysis 42...
Страница 43: ...43 Trouble Analysis Pulley and Belt...
Страница 44: ...Appendix A Fan and Arrangement 44 Fan Discharge Arrangement...
Страница 50: ...Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement HEPA AstroCel VXL Filter 50...
Страница 51: ...Typical Motor Wiring Diagram 51...
Страница 52: ...52 Service Light and Door Switch Wiring...
Страница 53: ...Factory Installed VFD TR200 Wiring Setting 53...
Страница 54: ...Factory Installed VFD TR200 Wiring Setting 54 TR200 BASIC SETTING_OPEN LOOP...
Страница 56: ...Pre Start Up Checklist 56...
Страница 57: ...Pre Start Up Checklist 57...