29
Piping and Connection
Trane recommends the use of a properly sized liquid line
filter-drier installed upstream from the expansion valve and as
close to the evaporator coil as possible. Base filter drier
selection on a minimum pressure drop of 2 psi at the design
condition.
1.
2.
3.
4.
1.
2.
3.
4.
Refrigerant Coil Piping
TYPE FD COILS HAVE BEEN DEHYDRATED AND
CHARGED WITH A HOLDING CHARGE OF DRY
NITROGEN. 20 PSIG TO PREVENT LEAKS AND SYSTEM
CONTAMINATION. DO NOT BREAK THE SEALS UNTIL
THE COIL IS INSTALLED.
Follow accepted refrigeration piping practices and safety
precautions for typical refrigerant coil piping and
components. Specific recommendations are provided with
the condensing units, including instructions for
pressure-testing, evacuation, and system charging.
General recommendations for component selection and
line sizing follow.
Leak-test the entire refrigeration system after all piping is
complete.
Charge the unit according to approximate weight
requirements, operating pressure and superheat/sub
cooling measurements.
Adjust the thermal expansion valve setting if necessary.
General refrigerant Piping Recommendations
General refrigerant Piping
Recommendations
IMPORTANT: REFER TO THE NOTE ON THE INSIDE
FRONT COVER OF THIS MANUAL REGARDING
HANDLING OF REFRIGERANT.
Install moisture indicator/sight glass between the
expansion valve and filter-drier. The moisture
indicator/sight glass must be sized to match the size of the
liquid line at the thermal expansion valve.
Size liquid line shutoff valve with an access port using the
selected liquid line OD, and install it close to the
condenser.
Minimize use of the other valves, tube bends and reducers
since these items tend to increase pressure drop and to
reduce subcooling at the expansion valve.
The Thermal Expansion Valve (TEV) must be selected for
proper size and capacity. The size of the TEV should cover
5.
Install suction line pressure tap on the leaving side of the
evaporator coil near the TEV sensing bulb location. Accurate
superheat measurement and thermal expansion valve
adjustment demands that suction pressure be measured near
the evaporator coil.
All compressors have a Refrigerant Charge Limit (RCL) that
must not be exceeded. Since the RCL and pressure drop are
in direct conflict with each other, Trane recommends that the
liquid line be sized as small as possible, while maintaining a
low enough pressure drop to ensure 5ºF(3ºC) of subcooling at
the expansion valve.
Suction line tubes must be sized to maintain refrigerant
vapour velocities that are high enough to ensure oil
entertainment under all operating conditions. It is not
necessary to pitch horizontal suction lines toward the
compressor when refrigerant coils are used with Trane
condensing units that are designed with a gas trap in the
suction line just prior to the compressor.
the full range of loadings. Check that the valve will
successfully operate at the lightest load conditions. Select
expansion valve with external equalizer connections, and
those designed to operate against a back pressure of 20
psi, higher than actual evaporator pressure.
Install the TEV directly in the coil liquid connection
(distributor) provided. The liquid distributor must be in a
true vertical position.
Liquid Line Component
Suction Line Components
Liquid Line Sizing
Suction Line Sizing
Содержание CLCP Euro 25
Страница 16: ...Assembly Installation CLCP EURO 50 Breakpoint Frame to Frame 16 CLCPEURO 50 Break Point Frame to Frame Joining...
Страница 17: ...17 Assembly Installation CLCP EURO 50 Breakpoint Panel to Frame CLCPEURO 50 Break Point Panel to Frame Joining...
Страница 18: ...Assembly Installation CLCP EURO CLCP EURO XP Paneling 18...
Страница 22: ...Assembly Installation CLCP EURO XP CKD At Jobsite 22...
Страница 23: ...23 Assembly Installation CLCP...
Страница 24: ...Assembly Installation CLCP 24...
Страница 40: ...Maintenance 40 Figure 20 Belt Tension Measurement...
Страница 42: ...Trouble Analysis 42...
Страница 43: ...43 Trouble Analysis Pulley and Belt...
Страница 44: ...Appendix A Fan and Arrangement 44 Fan Discharge Arrangement...
Страница 50: ...Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement HEPA AstroCel VXL Filter 50...
Страница 51: ...Typical Motor Wiring Diagram 51...
Страница 52: ...52 Service Light and Door Switch Wiring...
Страница 53: ...Factory Installed VFD TR200 Wiring Setting 53...
Страница 54: ...Factory Installed VFD TR200 Wiring Setting 54 TR200 BASIC SETTING_OPEN LOOP...
Страница 56: ...Pre Start Up Checklist 56...
Страница 57: ...Pre Start Up Checklist 57...