Maintenance

37

4.  Air Filters

5.  Drain Pans

Steam, hot water and chilled water coils should be kept clean 
to maintain maximum performance. lf fins become dirty, clean 
with steam and detergent, hot water spray and detergent, or 
one of the commercially available chemical coil cleaners. 
Rinse coils thoroughly after cleaning.

In the event of coils being out of commission for some time, it 
is advisable to completely drain down the coil. On each 
occasion when refilling is undertaken, check that the coil is 
effectively vented.
Periodic cleaning of the coils is required.
Dirty coils have increased airside pressure drops and reduced 
heat transfer, thus unbalancing the cooling or heating system.

In the event that fin edges have been bent, they can be 
straightened with the aid of a coil comb. The cleaning is 
carried out with the unit intact using a powerful vacuum 
cleaner on the dust-contaminated side. If the unit is very dirty 
it will need to be removed and wet cleaned. 
If required, soft cleaning brushes may be used ensuring that 
the heat exchanger fin are not damaged. Frost protection.
Check that frost protection is working before the 
commencement of each winter period. Ensure that the frost 
sensor is correctly installed and fitted and is working within the 
correct temperature range.

Check the cleanliness of the droplet separator section and the 
blades annually. If the blades are dirty, remove and clean 
them. Contamination can result in damage through water 
droplets in the system’s performance. Ensure that the blades 
are correctly repositioned and that they are not distorted.

WARNING

Follow all directions provided with chemical cleaners to 
avoid personal injury and/or coil damage. Commercially 
available chemical cleaners may contain caustic or 
hazardous agents.

6.  Coil Cleaning

Cleaning

Drop eliminator

Appendix B provides filter size, type and quantity. To replace 
throwaway filters, install new filters with the directional arrows 
pointing in direction of airflow. To clean permanent filters wash 
under a stream of water to remove dirt and lint. Remove oil 
filter (aluminium or grease filter) with a wash of mild alkali 
solution. Rinse in clean, hot water and allow to dry. Coat both 
sides of the filter by immersing or spraying it with Air Maze 
Filter Lote W or equivalent. Allow to drain and dry for about 12 
hours.

Inspecting Cleaning
The condensate drain pan and drain line must be checked to 
assure that the condensate drains as designed. This 
inspection should occur a minimum of every six month or 
more often as dictated by operating experience.
For units with sloped drain pans: If evidence of standing water 
or condensate overflow exists, steps should be taken to 
identify and remedy the cause immediately. Refer to the 
troubleshooting section of this manual for possible causes 
and solutions. If microbial growth in the drain pan is observed, 
it should be cleaned and removed immediately. Drain pans 
should be cleaned using the following procedure:

1.
2.
3.
4.

5.

6.

7.

8.

9.

Disconnect all electrical power to the unit.
Don the appropriate personal protective equipment (PPE).
Remove all standing water.
Use a scrapper or other tools to remove any solid matter. 
Remove solid matter with a vacuum device that utilizes 
high efficiency particulate arrestance (HEPA) filters with a 
minimum efficiency of 99.97% at 0.3 micron particle size.
Thoroughly clean the contaminated area(s) with a mild 
bleach and water solution or an EPA-approved sanitizer 
specifically designed for HVAC use. Carefully follow the 
sanitizer manufacturer’s instructions regarding the use of 
the product.
Immediately rinse the drain pan thoroughly with fresh 
water to prevent potential corrosion from the cleaning 
solution of the drain pan and drain line components.
Allow the unit to dry thoroughly before putting the system 
back into service.
Determine and correct the cause of the microbial 
contamination.
Be careful that the contaminated material does not contact 
other areas of the unit or building. Properly dispose of all 
contaminated materials and cleaning solution.

Содержание CLCP Euro 25

Страница 1: ...Installation Operation Maintenance Quantum Climate Changer Air Handlers Model CLCP Euro 25 CLCP Euro 50 CLCP Euro XP Airflow Range 1000 65 000 CFM 0 5 31 m s October 2018 IND SVN01A E4...

Страница 2: ...afe practices Indicates a situation that could result in equipment or property damage only accidents WARNING CAUTION NOTICE Important Environmental Concerns Important Responsible Refrigerant Practices...

Страница 3: ...se regulations supersede these policies Non Ingersoll Rand personnel should always follow local regulations WARNING Follow EHS Policies Copyright This document and the information in it are the proper...

Страница 4: ...ing Moving to Position On Site Forklift Truck Roller Movement LH RH Convention Foundation Erection Duct Connections External Connection Frame to Frame Connection Panel to Frame Connection Panelling Br...

Страница 5: ...QuantumTM Air Handler are Central Station Air Handlers designed for a variety of controlled air application The basic unit consists of a fan heating and or cooling coils filters and air dampers See pr...

Страница 6: ...Section 1 Type W WL 1 2 Tube H WLH 1 2 Tube A A 1 2 Tube L LL 1 2 Tube Q WLQ 1 2 Tube B AA 1 2 Tube D DL 1 2 Tube F FD 1 2 Tube S Special 21 Coil Connection L LH Side R RH Side B Both Sides X None 22...

Страница 7: ...rotected The warranty will not cover damages to the unit do to negligence during storage Indoor storage is ideal and requires only a few special precautions To protect the unit from damage due to the...

Страница 8: ...units must only be applied via the unit base frame or shipping pallet Rigging and Handling A specific lifting method for offloading the units is recommended as follows See Figure 2 1 2 3 4 5 Off Load...

Страница 9: ...Rigging and Handling 9 APPLICABLE ON ALL SECTION OTHER THAN SECTION WITH DRAINPAN APPLICABLE ON SECTION WITH DRAINPAN ONLY Figure 3 Lifting a coil section using a sling rope Figure 2...

Страница 10: ...In the case of larger units the use of several forklift trucks may be required Use extended fork lifting to prevent Drain pan damages during handling Base panel and structure damages Coil header and...

Страница 11: ...ure 9 gives recommended space allowances On the designated access side of the unit working areas must have minimum 1 mtr space P Allowance for coil connections dimension C must be dimension 200mm unit...

Страница 12: ...Heating and Air Conditioning System 90B Inlet and discharge air duct connections to the unit should be made with a flexible material minimizing noise and vibration Typically about three inches is need...

Страница 13: ...FOR CLCP 25mm FOR CLCP 50mm Assembly Installation CLCP EURO CLCP EURO XP External Connection BREAK POINT JOINING METHOD MODULE TO MODULE BREAK POINT EXTERNAL JOINING TO BE DONE AT JOB SITE 13...

Страница 14: ...Assembly Installation CLCP EURO 25 Breakpoint Frame to Frame OMS C0325_B CLCPEURO 25 Break Point Frame to Frame Joining 14...

Страница 15: ...Assembly Installation CLCP EURO 25 Breakpoint Panel to Frame OMS C0326_B CLCPEURO 25 Break Point Panel to Frame Joining 15...

Страница 16: ...Assembly Installation CLCP EURO 50 Breakpoint Frame to Frame 16 CLCPEURO 50 Break Point Frame to Frame Joining...

Страница 17: ...17 Assembly Installation CLCP EURO 50 Breakpoint Panel to Frame CLCPEURO 50 Break Point Panel to Frame Joining...

Страница 18: ...Assembly Installation CLCP EURO CLCP EURO XP Paneling 18...

Страница 19: ...19 Assembly Installation CLCP EURO XP Breakpoint ASSEMBLY INSTALLATION CLCPEURO XP BREAKPOINT INTERNAL JOINT TYPE1...

Страница 20: ...Assembly Installation CLCP EURO XP Breakpoint 20 ASSEMBLY INSTALLATION CLCPEURO XP STANDARD SECTION TO WIDER SECTION INTERNAL JOINT TYPE 2...

Страница 21: ...21 Assembly Installation CLCP EURO XP Breakpoint ASSEMBLY INSTALLATION CLCPEURO XP STANDARD SECTION TO WIDER SECTION INTERNAL JOINT TYPE 3...

Страница 22: ...Assembly Installation CLCP EURO XP CKD At Jobsite 22...

Страница 23: ...23 Assembly Installation CLCP...

Страница 24: ...Assembly Installation CLCP 24...

Страница 25: ...stallation CLCP Removing Replacing a motor CLCP 003 015 Removing shipping bracket non drive side CLCP 003 035 Apply Silicone along panel parameters prior to installing back the panel after removing sh...

Страница 26: ...the drain pan will likely overflow Figure 13 Drain Pan Trapping for module under Negative Pressure Figure 13 H 1 for each 1 of maximum negative pressure 1 J 1 2H L H J Pipe Diameter Insulation Unit Wi...

Страница 27: ...mmendation Refer to Figure 15 17 for typical cooling heating and steam coil piping Proper installation piping and trapping is necessary to assure satisfactory coil operation and to prevent operational...

Страница 28: ...as possible to the coil Vent the vacuum breaker line to the atmosphere or connect it to the return main at the discharge side of the steam trap Run the return pipe at the full size of the steam trap c...

Страница 29: ...d line OD and install it close to the condenser Minimize use of the other valves tube bends and reducers since these items tend to increase pressure drop and to reduce subcooling at the expansion valv...

Страница 30: ...cked To braze Thermostatic Expansion Valves TXV avoid direct flame figure 19 to the valve body and avoid excessive heat on diaphragm As an extra precaution a wet cloth may be around the body and eleme...

Страница 31: ...Piping and Connection Factory Supplied OFF Set Type Coil Flange Installation CLCP 030 050 For Double Coil In Single casing LL WL 4 Row Only 1 Flange Socket Weld Standard 2 Flange Socket Weld Offset Ty...

Страница 32: ...correct it 7 8 Perform the following steps prior to starting the unit 1 2 Inspect electrical connections They should be clean and secure Compare actual wiring with specific diagrams provided on the un...

Страница 33: ...USE FOR VIBRATION Fan RPM can be determined by using a strobe type tachometer or revolution counter Align the fan motor sheaves by using a straightedge The straightedge must be long enough to span the...

Страница 34: ...or ductwork Even when locked out electrically fans may cause injury or damage if the impeller is subject to wind milling The impeller should be secured to physically restrict rotational movement can...

Страница 35: ...1 gives recommended maintenance intervals for the CLCP unit Intervals are based upon normal running conditions in a moderate climate and assuming 24 hour running Units operating outside these guideli...

Страница 36: ...ion instruction Most smaller frame motors come without grease nipple where the bearings are permanently sealed The motor with double shielded bearings are lubricated for life and cannot be re lubricat...

Страница 37: ...directional arrows pointing in direction of airflow To clean permanent filters wash under a stream of water to remove dirt and lint Remove oil filter aluminium or grease filter with a wash of mild al...

Страница 38: ...r pulley or bushing installation wobbling and or damaged pulleys can unbalance a drive wear out belt rapidly and damage bearings and bend shafts Check and repair worn bearings and bent shafts Select r...

Страница 39: ...e component life and is based on fan brake horsepower requirement Check the belt tension as follows Measure the span length mm of the drive With a belt tensioner at the center of the span apply a forc...

Страница 40: ...Maintenance 40 Figure 20 Belt Tension Measurement...

Страница 41: ...th dirt preventing proper ventilation Overloaded motor Motor fan damaged Remove fan cover clean fan and replace cover Reduce load or replace with larger motor Replace motor fan clean Excessive vibrati...

Страница 42: ...Trouble Analysis 42...

Страница 43: ...43 Trouble Analysis Pulley and Belt...

Страница 44: ...Appendix A Fan and Arrangement 44 Fan Discharge Arrangement...

Страница 45: ...Appendix B Filter Layout and Quantity 45 Filter Dimension Nominal and Arrangement Flat Bag Cartridge Air Filter 6110 3130_2 page1...

Страница 46: ...Appendix B Filter Layout and Quantity 46 Filter Dimension Nominal and Arrangement Flat Bag Cartridge Air Filter 6110 3130_2 page2...

Страница 47: ...47 6110 3286_A Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement High Capacity Air Filter Angle Filter...

Страница 48: ...48 Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement HEPA AstroCel I HCX Filter 6110 3323_A...

Страница 49: ...49 6112 1853 Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement HEPA AstroCel VXL Filter...

Страница 50: ...Appendix B Filter Layout and Quantity Filter Dimension Nominal and Arrangement HEPA AstroCel VXL Filter 50...

Страница 51: ...Typical Motor Wiring Diagram 51...

Страница 52: ...52 Service Light and Door Switch Wiring...

Страница 53: ...Factory Installed VFD TR200 Wiring Setting 53...

Страница 54: ...Factory Installed VFD TR200 Wiring Setting 54 TR200 BASIC SETTING_OPEN LOOP...

Страница 55: ...lar maintenance of your installation by a specialist in our equipment Regular maintenance ensures that any malfunction is detected and corrected in good time and minimizes the possibility that serious...

Страница 56: ...Pre Start Up Checklist 56...

Страница 57: ...Pre Start Up Checklist 57...

Страница 58: ...crease industrial productivity and efficiency We are a 13 billion global business committed to a world of sustainable progress and enduring results For more information visit www ingersollrand com Ing...

Отзывы: