
8
3. Foundations and
Erection
Figure 8 – Air Handling Unit Plinth Foundation
FAILURE TO PROVIDE A LEVEL
PLINTH OR SUPPORT WILL RESULT
IN DOORS JAMMING AND AIR LEAKS
FROM THE CASING.
3.2 Erection
To minimize noise transmission,
insulation material such as cork slabbing
(TICO pads) may be placed between the
unit base and the foundation (see Figure
8).
IMPORTANT
CLCH-SVX05A-GB