background image

10

4. Assembly and

Installation

4.2 Stacked Units (Top and

Bottom)

Lower the top unit into position on top of

the bottom unit, taking care not to

damage the sealing gaskets.
Fit the self-tapping screws to the fixing

brackets, which are already positioned on

the top edge of the bottom unit,drilling into

the top unit  section (10A) or base frame

(10B) depending on product, in order to

secure the top unit to the bottom unit (see

Figure 10).
Fix into position any internal joining strips

and/or brackets that are provided, and

then seal up any common sections in the

top and bottom units.

4.2.1. Stacked units (Side by Side)

Manoeuvre the two units into their correct

positions, taking care not to damage any

sealing gaskets.
Fix through the fixing brackets which are

located at both ends of the units in order

to secure the units together. Also fix into

position any base frame, unit end, and

roof joining brackets that are provided.
Fix into position any internal joining strips

and/or brackets that are provided, and

then seal up any common sections in

both of the units.
If you require further assistance or have

any questions please contact your local

Trane sales office. 

4.3 Assembly of Flatpacked

Units

The unit is fully assembled in the factory

on a flat and level surface. Prior to

disassembly for flat packing (see Figure

11) all items are marked

alphanumerically. All items marked “A”

are joined at the fixing indicated at this

point. These markings are on labels on

internal surfaces so they are not evident

upon completion. DO NOT remove labels

until assembly is complete.
We would recommend opening one unit

at a time to avoid confusion.

Figure 10 A/B

Figure Notes:

1. Self tapping screws
2. Bottomframework of TOP unit
3. Fixing bracket
4. Top framework of BOTTOM unit

Figure 11

CLCH-SVX05A-GB

Figure 10A

Figure 10B

1

2

4

3

Содержание CLCH

Страница 1: ...Installation Operation Maintenance CLCH QuantumClimate Changer Air Handling Units CLCH SVX05A GB...

Страница 2: ...l inspect the unit before signing the delivery note Specify any damage on the delivery note and send a registered letter of protest to the last carrier of the goods within 72 hours of delivery Notify...

Страница 3: ...18 23 1 Introduction 2 Delivery Check On Arrival Off Loading and Movement To The Site 3 Foundations and Erection 4 Assembly and Installation 5 Commissioning Procedure 6 Maintenance 7 Troubleshooting...

Страница 4: ...CLCH SVX05A GB 4 1 Introduction Please pay particular attention to the instructions on the unit in accordance with the identification label assembly drawings and special warnings or advice labels...

Страница 5: ...ff Loading A specific lifting method for offloading the units is recommended as follows see Figure 3 1 52 mm diameter lifting holes or certified lifting lugs are provided on the unit base frame 2 ALL...

Страница 6: ...ainst the unit base frame The lift point should be as near as possible to the centre of gravity see Figures 4 and 4a In the case of larger units the use of several forklift trucks may be required 2 4...

Страница 7: ...d the unit to ensure that correct operation and effective maintenance can be carried out Figure 6 gives recommended space allowances On the designated access side of the unit working areas must be equ...

Страница 8: ...O PROVIDE A LEVEL PLINTH OR SUPPORT WILL RESULT IN DOORS JAMMING AND AIR LEAKS FROM THE CASING 3 2 Erection To minimize noise transmission insulation material such as cork slabbing TICO pads may be pl...

Страница 9: ...to manoeuvre the sections together Greased skid plates will greatly assist the whole assembly operation 4 Secure the break point joint externally by replacing the 4 M6 bolts and washers which were pr...

Страница 10: ...e the units together Also fix into position any base frame unit end and roof joining brackets that are provided Fix into position any internal joining strips and or brackets that are provided and then...

Страница 11: ...reak by means of a tun dish must be fitted immediately after the trap Figure 12 Typical Air Conditioning Plant Drain Figure 12 Notes 1 Cooling coil humidifier or chilled battery 2 Vented drainage stac...

Страница 12: ...ns 1 2 pipe diameter insulation Figure Notes 1 Minimum of 12 mm 2 12 mm maximum total static pressure Figure 15 Drip Pans 1 1 2 2 3 4 5 Drip Pans A UPVC elbow and 1 1 2 38 mm diameter internal dimensi...

Страница 13: ...ntrol system used All pipework must be supported independently from the coils All connections must be made in such a way that the expansion and contraction of pipes do not impose forces on the coil he...

Страница 14: ...the casing must be made with a gland or grommet All wiring to other accessories must be carried out in the same manner PLEASE REFER TO THE UNIT MOUNTED CONTROLS IOM Motor connection details are conta...

Страница 15: ...0 70 0 85 5 108 0 127 0 146 0 162 0 177 5 Approximate Mass kg 0 1 0 1 0 2 0 3 0 7 1 5 2 7 3 8 5 6 7 5 11 1 Fenner is a registered trademark of J H Fenner Co Ltd Taper Lock and P B Precision Built are...

Страница 16: ...device will fade 16 5 Commissioning Procedure 5 4 Unit Connections All electrical water and ductwork connections of the unit must be completed by a qualified person To avoid damaging the coil connect...

Страница 17: ...ork the unit is started up for a test run To conduct a test run that involves the measurement of motor and fan performance the unit must be connected to the complete installation All access doors must...

Страница 18: ...A GREASE 3 SHELL MOBILUX 3 MOBIL BEACON 3 ESSO SKF 28 BALL BEARING GREASE Do not overlubricate bearings Excessive pressure caused by overlubrication can displace bearing grease seals or cause grease t...

Страница 19: ...80 140 112 236 224 375 56 80 125 200 to to to to to to to to to to to to 95 130 132 200 224 315 355 560 100 140 200 400 Newton N 13 20 25 35 45 65 85 115 5 10 20 40 to to to to to to to to to to to to...

Страница 20: ...end of bush using a block of sleeve to prevent damage This will ensure that the bush is seated squarely in the bore Screws will now turn a little more Repeat this alternate hammering and screw tighten...

Страница 21: ...n the unit is at rest and check the function of the fan overrun in this context 6 8 5 Direct expansion coils Never use hot water or steam to clean these coils During normal operation the fin block mus...

Страница 22: ...6 1 For Corrosion Yes 6 1 Flexible Connection Yes 6 1 Anti Vibration Mounts Yes 6 1 Inlet Guide Vane Controller Yes Drainage Yes 6 1 Fan Bearing Yes 6 2 Motors In General Yes 6 3 Motor Bearing Yes 6 3...

Страница 23: ...r grease on belts Clean belts and pulleys check for grease leaks Belts rubbing Remove obstruction Odd belts being fitted Replace with full set Filters collapsing Blocked with dirt Change at advised di...

Страница 24: ...vement it reserves the right to change design and specifications without notice Only qualified technicians should perform the installation and servicing of equipment referred to in this publication So...

Отзывы: