Installation of the Condensate Pipe
Celling
1.57 inch
t
Celling slab
INW
setting bolt(M8)
fixing bolt(M6)
40 mm
Levelling the Unit
1. Ensure that the unit is level side to side for floor applications.
2. For ceiling applications the unit must be level side to side. Adjust the height of the unit fore
and aft to make the drain pipe slant slightly downward so condensate water will flow properly.
CAUTION
Seal properly and verify there is no water leakage from the joint of the condensate pipe.
Failure to do so may result in equipment and/or property damage.
14
Floor and Ceiling Unit