Appendix B: Chiller Installation Completion and Request
for Trane Service
IIm
mp
po
orrtta
an
ntt:: A copy of this completed form must be
submitted to the Trane Service Agency that
will be responsible for the start-up of the
chiller. Start-up will NOT proceed unless
applicable items listed in this form have
been satisfactorily completed.
TO:
TRANE SERVICE OFFICE:
S.O. NUMBER:
SERIAL NUMBERS:
JOB/PROJECT NAME:
ADDRESS:
The following items
are being installed
and will be completed by:
IIm
mp
po
orrtta
an
ntt:: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane
®
products. Contractor shall provide Trane
(or an agent of Trane specifically
authorized to perform start-up) with notice
of the scheduled start-up at least two weeks
prior to the scheduled start-up. E
Eq
qu
uiip
pm
me
en
ntt
n
no
ott sstta
arrtte
ed
d b
by
y T
Trra
an
ne
e iiss n
no
ott w
wa
arrrra
an
ntte
ed
d b
by
y
T
Trra
an
ne
e..
N
No
otte
ess:: Improper installation of CenTraVac
™
chillers,
including optional components, can result in
start-up delay and required rework. Follow all
provided instructions and in use particular care
with optional devices:
•
Follow installation procedures for
RuptureGuard
™
; refer to CTV-SVX06*-EN
for CDHF, CDHG, CVHE, CVHF, CVHG, and
CVHM models, refer to CDHH-SVX003*-EN
for CDHH models, and refer to CVHH-
SVX003*-EN for CVHH CenTraVac
™
chiller
models.
•
Do NOT over-insert or over-torque the probe
of the ifm efector
™
flow detection controller
and sensor; refer to PART-SVN223*-EN or
the CenTraVac
™
chiller
Installation,
Operation, and Maintenance
manual.
•
Do NOT block serviceable parts when
installing isolation springs.
Expenses that result in improper installation of
CenTraVac
™
chillers, including optional
components, will NOT be paid by Trane.
Check box if the task is complete or if the answer is
“yes”.
1.
C
Ch
hiilllle
err
☐
In place and piped.
N
No
otte
e:: Do not insulate the CenTraVac
™
chiller or
adjacent piping prior to the chiller
commissioning by Trane service personnel.
The contractor is responsible for any foreign
material left in the unit.
2. P
Piip
piin
ng
g
Chilled water piping connected to:
☐
CenTraVac
™
chiller
☐
Air handling units
☐
Pumps
☐
Optional ifm efector
®
flow detection controller
and sensor properly installed
Condenser and heat recovery condenser (as
applicable) piping connected to:
☐
CenTraVac
™
chiller
☐
Pumps
☐
Cooling tower
☐
Heating loop (as applicable)
Additional piping:
☐
Make-up water connected to cooling tower
☐
Water supply connected to filling system
☐
Systems filled
☐
Pumps run, air bled from system
☐
Strainers cleaned
☐
Rupture disk or RuptureGuard
™
ventilation
piping properly installed
☐
Optional RuptureGuard
™
properly installed
3. F
Fllo
ow
w b
ba
alla
an
ncciin
ng
g v
va
allv
ve
ess iin
nsstta
alllle
ed
d
☐
Leaving chilled water
☐
Leaving condenser water
☐
Optional heat recovery or auxiliary condenser
water
4. G
Ga
au
ug
ge
ess,, tth
he
errm
mo
om
me
ette
errss,, a
an
nd
d a
aiirr v
ve
en
nttss
☐
Installed on both sides of evaporator
☐
Installed on both sides of condenser and heat
recovery condenser (as applicable)
5. W
Wiirriin
ng
g
☐
Compressor motor starter has been furnished
by Trane, or has been configured and installed
in compliance with the appropriate
Trane
Engineering Specification for Starter by Others
(available from your local Trane Sales Office)