![TR-Electronic CEK-65 Скачать руководство пользователя страница 148](http://html1.mh-extra.com/html/tr-electronic/cek-65/cek-65_user-manual_1146666148.webp)
Commissioning - Support
TR-Electronic GmbH 2008, All Rights Reserved
Printed in the Federal Republic of Germany
Page 148 of 155
TR - ECE - BA - DGB - 0073 - 07
06/27/2017
3. Create a new Controller Tag under the folder structure
Controller Tags
and
perform the following adjustments:
●
Type
: Base
●
Data_Type
: Message
●
Scope
: choose the created project name
4. Create a new Message Control under the folder structure
Tasks --> MainRoutine
in the tab
Input/Output
-->
MSG
. Bind the MSG-Control with the Controller Tag
created above.