¾
Configuration Procedure
z
Configure Switch A
Step Operation
Description
1 Configure the
Link Type of the
ports
Required. On
VLAN
→
802.1Q VLAN
→
Port Config
page, configure the
link type of Port 11 and Port 13 as ACCESS, and configure the link type
of Port 12 as GENERAL.
2 Create
VLAN10 Required.
On
VLAN
→
802.1Q VLAN
→
VLAN Config
page, create a
VLAN with its VLANID as 10, owning Port 12 and Port 13, and
configure the egress rule of Port 12 as Untag.
3 Create
VLAN20 Required.
On
VLAN
→
802.1Q VLAN
→
VLAN Config
page, create a
VLAN with its VLANID as 20, owning Port 11 and Port 12, and configure
the egress rule of Port 12 as Untag.
z
Configure Switch B
Step Operation
Description
1 Configure the
Link Type of the
ports
Required. On
VLAN
→
802.1Q VLAN
→
Port Config
page, configure the
link type of Port 4 and Port 5 as ACCESS, and configure the link type of
Port 3 as GENERAL.
2 Create
VLAN10 Required.
On
VLAN
→
802.1Q VLAN
→
VLAN Config
page, create a
VLAN with its VLANID as 10, owning Port 3 and Port 4, and configure
the egress rule of Port 3 as Untag.
3 Create
VLAN20 Required.
On
VLAN
→
802.1Q VLAN
→
VLAN Config
page, create a
VLAN with its VLANID as 20, owning Port 3 and Port 5, and configure
the egress rule of Port 3 as Untag.
4 Create
Protocol
Template
Required. On
VLAN
→
Protocol VLAN
→
Protocol Template
page,
configure the protocol template practically. E.g. the IP network packets
are encapsulated in Ethernet II format and its Ether Type is 0800; the
AppleTalk network packets are encapsulated in SNAP format and its
PID is 809B.
72