Figure 43: ng04 Tray leg installation.
Figure 42: ngo4 Secondary floor installation.
If converting to propane see conversion
instructions on “Propane Conversion”
on page 33 before proceeding.
1. Install one side of the secondary floor as
shown. Repeat with the other side but
do not put in the two center screws until
you put the center tray leg in place
(Figure 42 and Figure 43).
2. Attach tray legs as shown in Figure 43
The center tray leg and the right side
of the secondary floor are attached with
the same screws to the center floor leg.
3. Attach pilot to center tray leg (Figure 44)
ATTACH HERE AND ON OPPOSITE SIDE
ATTACH CENTER TRAY
LEG AND SECONDARY
FLOOR TOGETHER
ROUTE PILOT UP
THROUGH HERE
ROUTE PILOT UP
THROUGH HERE
Installation:
Figure 44: ng04 Pilot positioning.
100001140
28
TCWS54STOK_270619-56
Содержание D Series
Страница 53: ...100001140 Wiring Diagram 53 TCWS54STOK_270619 56 ...
Страница 55: ...100001140 55 TCWS54STOK_270619 56 ...