- 8 -
tousek
/ E_SWING-X_42001005 / 06. 02. 2012
3.
Emergency release of the operator at power failure
Swing gate operator SWING X
• should it be necessary to release the operator (e.g. in
case of power failure, please proceed as follows:
• Turn off power supply of gate facility!
• Unlock the emergency release lock and turn the emergency
release lever to the limit (for 90°).
• The operator is now unlocked and the gate may be moved
manually (
slowly
!- not faster than with the operator).
• For operator usage turn the emergency lever back to its
initial position and close the emergency release lock.
• After that turn on the power supply.
After impulse transmission the limit positions (OPEN and
CLOSE) are being automatically adjusted.
• The gate facility must be turned off from power supply
when making the electrical connections.
• The motor wire
(M)
and sensor wire
(S)
have to be connected
to the control unit as described in the manual of the control
unit.
• Please note the colours (from motor cable) and the index
number 1–3 (from sensor cable) !
• For the connection of diverse safety devices, transmitters and
other accessories please check the corresponding manuals
(please note cable/wire plan).
• The force adjustment of the operator is made through the
control unit
(please see manual for control unit)
.
Warning
• Before carrying out the electrical connections, the power supply of the gate facility must be turned off
• The safety regulations for electric shock prevention have to be complied.
• The device should only be connected by qualified personnel
• The device should not be used in an explosive environment !
• An all-pole disconnecting mains switch with a contact opening gap of min. 3 mm has to be foreseen. The gate
facility has to be secured according to the valid safety regulations!
• IMPORTANT: The control lines (buttons, radio, photocells, etc.) have to be laid separately from the 230V lines
(supply line, motors, signal lamp).
• The safety standards and regulations regarding the force adjustment have to be in compliance with the effective rules !
2
1
3
M
S
3
2
1
yellow/
green
black
blue
braun
2d. Electric connections
and force adjustment
Installation
Important
• The motor and sensor wires have to be supplied to the control unit by two separate lines !
The sensor wire must not exceed the max. length of 50m !
• For the sensor supply line between operator and electronic control make sure that only the 3 electronic con
-
trol cables are being clamped - do not clamp to a ground wire (earth lead)!
2e. Dismounting
the dismounting of the motor is effected in the opposite order of installation.
Please note that before dismounting the operator the power supply has to be turned off !