2b.  Installation of the operator 

Installation

•  After having mounted the welding parts 

and junction plates(3)

  

please install the operator as follows.

•  Before  mounting  please  note  that  the  moving  parts 

should be lubricated on their pivotal points!

•  Now slide the operator with the fork on the rear welding 

part 

(2)

 , insert the brazed screw from above, place a plate  

below and fix with by using the screw nut.   

•  the screw nut that has been tigthened before, should 

now be opened a little (approx. 1/4 turn), to ensure the  

movability on the pivotal point!

•  Now turn the gate wing until the bolt/pin of the part 

(L)

 (= 

part which is moved through the operator spindle)  can be 

put  from above into the drilling of the front welding part 

(1). 

 

Then place a plate  below and fix by using the screw nut.   

•  the screw nut that has been tigthened just now, should 

now be opened a little (approx. 1/4 turn), to ensure the  

movability on the pivotal point!

  Lubrication 

for moving mounting parts

•  The pivotal points of the operators (holes of welding 

parts and corresponding pins/screws, that are used 

for the attachment of the operator on the welding 

parts, have to be lubricated before installation

 of 

the operator !

 

1

3

2

3

•  Now  move  the  internal  limit  stop  „closed“ 

(5)-

 after  

dismantling the  hexagon head screw- towards the part 

(L)

  

(on contact!). After that please 

tighten

 the hexagon head 

screw.

•  Now move the gate into OPEN limit position.
•  Now  move  the  internal  limit  stop  „open“ 

(6)

-after dis-

mantling the  hexagon head screw - towards the partl 

(L)

   

(on contact!). After that please 

tighten

 the hexagon head 

screw again.

•  Lock the operator again.

5

L

6

L

 

Readjustment

•  When operator is ready for operation , place/drive/move 

the operator with electricity  (through an impulse) into 

limit positions and if necessary readjust the internal limit 

stops.

•  Before adjusting the operator please 

 

disconnect from power supply   

 

2c.  Adjustment of internal limit stops 

Installation

•  The operator type SWING X is equipped with internal limit 

stops that can be used for gates 

below 200kg

 and with a 

wing width below 3m for adjustment of limit positions OPEN 

and CLOSED.

•  The following steps describe the adjustment for 

gates ope-

ning to the inside

 (when opening to the outside then the 

limit stops have exactly the contrary function - 

(6)

 for closed 

and 

(5)

 for open position):

•  Unlock the gate 

(see „emergency release“).

•  Manually move  the gate with unlocked operator into end position 

 

CLOSED.

 Important 

(for gate wing > 200kg or >3m)

•  Gates with a weight over 200kg or with a width abo

-

ve 3m, as described here, can not be used with the 

internal limit stops, please use external limit stops 

(4) for gate limit positions!

 

Содержание Swing-X

Страница 1: ...Installation and operating instructions Swing gate operator SWING X ...

Страница 2: ...for the Handauslöser has to be placed next to its operating element The electric motor heats up during operation Therefore the device should only be touched after it has cooled off Please make sure that no other persons are on site of the motorised gate area especially in when operating the facility in hold to run mode switch with OFF pre adjustment The pre adjusted OFF button switch has to be pla...

Страница 3: ...uching an obstacle the operator stops and reverses automatically This guarantees a high degree of safety the operator closes the gate reliably The emergency release which is important in case of power failure is lockable with a stan dard profile half cylinder It can therefore be replaced and integrated into an already existing house key system The cylinder and 3 keys are included as standard equip...

Страница 4: ...hat can be used for gates below 200kg and with a wing width below 3m for adjustment of limit positions OPEN and CLOSED Gates with a weight above 200kg and more than 3m gate width can not be used with the internal limit stops please use external limit stops 4 for gate limit positions particularly in the closed position it is recommended to use always a floor limit stop 4 or Tousek piston rod With l...

Страница 5: ...t centered inside to gate leaf A B C D INSIDE max 60mm A B C D INSIDE Mounting measures SWING X3 opening to the INSIDE SWING X3 1 standard stroke SWING X3 1LH long stroke Application standard standard for larger columns for larger opening angle A mm 145 190 180 250 160 B mm 145 190 160 200 C mm 860 990 990 990 D mm 110 130 130 130 max opening angle 100 110 100 120 max wing width 3m 3m 3m 3m Mounti...

Страница 6: ... fully closed and that the vertical misalignment V 65mm between the two welding parts is kept to ensure a levelled mounting of the operator With lean or wooden gates the welding part should not be mounted directly on the gate Please use for that a flat steel bar support the front welding part 1 with a gusset plate 3 Mounting measures opening to the OUTSIDE SWING X3 1 standard stroke SWING X4 1 sta...

Страница 7: ...ve the internal limit stop closed 5 after dismantling the hexagon head screw towards the part L on contact After that please tighten the hexagon head screw Now move the gate into OPEN limit position Now move the internal limit stop open 6 after dis mantling the hexagon head screw towards the partl L on contact After that please tighten the hexagon head screw again Lock the operator again 5 L 6 L R...

Страница 8: ...unit please see manual for control unit Warning Before carrying out the electrical connections the power supply of the gate facility must be turned off The safety regulations for electric shock prevention have to be complied The device should only be connected by qualified personnel The device should not be used in an explosive environment An all pole disconnecting mains switch with a contact open...

Страница 9: ...e have to be secured In this context please follow the EU Machine Directive accident prevention rules and laws as well as applying EU and national standards in force at the time of installation and operation of the gate facility The Tousek Ges m b H cannot be held responsible for any consequences resulting from disregard of applying standards and laws during installation or operation of the gate f...

Страница 10: ...res in mm 1 front welding part installation on the gate supported by gusset plate 2 rear welding part installation on the gate column supported by gusset plate 5 internal limit stop for position CLOSED with gates opening to the inside 6 internal limit stop for position OPEN with gates opening to the inside L running part measures and technical modifications subject to change 5 Dimensioned sketch S...

Страница 11: ...tousek E_SWING X_42001005 06 02 2012 11 ...

Страница 12: ... Tousek GmbH Germany D 83395 Freilassing Traunsteiner Straße 12 Tel 49 86 54 77 66 0 Fax 49 86 54 5 71 96 info tousek de Tousek GmbH Switzerland CH 6275 Ballwil Bahnhofstraße 14 Tel 41 0 41 448 2965 Fax 41 0 41 448 2966 info tousek ch Tousek Sp z o o Poland PL 43 190 Mikołów k Katowic Gliwicka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 130 00 Praha 3 J...

Отзывы: