Strata CTX670 Installation
Site Requirements
Strata CTX I&M 10/02
3-3
Strata
CTX67
0
Inst
alla
tion
Note
The Base Cabinet may be mounted at the bottom of the stack.
Figure 3-1
CTX670 Minimum Clearance Requirements
24"
24"
78"
6"
14.5"
26.5"
Wall
Floor
Front View
Top View
78" is minimum height requirements
for Wall Mounting up to 7 cabinets.
Wall
26.5"
Cabinets
10.65 "
36"
Wall
Front View
Top View
75" is minimum height requirements
for Floor Mounting up to 7 cabinets.
12.65 "
Wall
26.5"
Cabinets
36"
2" Brackets
(RWBF)
5459
Floor
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Base
Cabinet
13.5"
24"
24"
75"
26.5"
3"
3" Floor
Mount
Stands
(BFIF)
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Expansion
Cabinet
Base
Cabinet
Содержание Strata CTX100
Страница 16: ...Introduction Related Documents Media xii Strata CTX I M 10 02 ...
Страница 94: ...Strata CTX100 Installation Installing the CTX100 Cabinet 2 24 Strata CTX I M 10 02 ...
Страница 150: ...Strata CTX670 Installation Remote Expansion Cabinet Unit 3 56 Strata CTX I M 10 02 ...
Страница 188: ...PCB Installation Network Requirements 4 38 Strata CTX I M 10 02 ...
Страница 238: ...T1 Loop Back Testing 6 12 Strata CTX I M 10 02 ...
Страница 310: ...Station Apparatus 2000 series Telephones 8 48 Strata CTX I M 10 02 ...
Страница 342: ...Peripheral Installation Station Message Detail Recording SMDR 9 32 Strata CTX I M 10 02 ...