– 1
11
–
No.
Part name
Electronic
expansion valve
coil
Procedure
Wire guard
1. Detachment
1) Perform work of item 1 of
.
2) Remove the front cabinet, and put it down
so that wire guard side directs downward.
Perform work on a corrugated cardboard,
cloth, etc. to prevent flaw to the product.
3) Remove the guard stopper (4 pcs.) from hook
of wire guard.
4) Turn the front cabinet into opposite site then
FILE NO. SVM-13069
pull wire guard up ward.
2. Attachment
1) Insert claws (2 positions) of the wire guard
in the holes of the front cabinet. Push the
hook (4 positions) by hands and fix by
Check that all the claws & hooks are fixed
to the specified positions.
1. Detachment
1) Perform step 1 in
, all the steps in
and 1 in
.
2) Remove the coil by pull it upward.
2. Attachment
1) Insert a valve coil to value body by push
it downward. And confirm to fix it surely.
Remarks
guard stopper.
Содержание RAS-09EAV-UL
Страница 18: ...5 WIRING DIAGRAM 5 1 RAS 09EKV UL RAS 09EAV UL FILE NO SVM 13069 18 ...
Страница 19: ... 19 FILE NO SVM 13069 5 2 RAS 09EKV UL RAS 09EAV2 UL ...
Страница 20: ...5 3 RAS 12EKV UL RAS 12EAV UL FILE NO SVM 13069 20 ...
Страница 21: ...FILE NO SVM 13069 5 4 RAS 12EKV UL RAS 12EAV2 UL 21 ...
Страница 164: ...TOSHIBA CARRIER THAILAND CO LTD ENGINEERING DATA BOOK 1 1 Inverter Single Split RAS 09 22EKV UL RAS 09 22EAV2 UL ...