– 9
5
–
11-8-5. Checking Method for Each Part
No.
1
Part name
Electrolytic capacitor
(For boost, smoothing)
Checking procedure
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3. Check that safety valve at the bottom of capacitor is not broken.
4. Check that vessel is not swollen or exploded.
5. Check that electrolytic liquid does not blow off.
6. Check that the normal charging characteristics are shown in continuity test by
the tester.
MCC-5009
Soldered
surface
Heat sink IGBT side
C12 C13 C14
Case that product is good
Pointer swings once, and returns
slowly. When performing test
once again under another
polarity, the pointer should return.
C12, C13, C14
→
500
µ
F
2
Diode block
FILE NO. SVM-13069
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3 Check that the normal rectification characteristics are shown in continuity
1
2
test b
Diode check
e
d
d
e
\
1
~
\
2
~
\
1
~
\
2
~
y the tester.
Tester rod
Resistance value
in good product
50k
Ω
or more
(0
Ω
in trouble)
~
+
–
~
1 2 3
(DB01)
4
Содержание RAS-09EAV-UL
Страница 18: ...5 WIRING DIAGRAM 5 1 RAS 09EKV UL RAS 09EAV UL FILE NO SVM 13069 18 ...
Страница 19: ... 19 FILE NO SVM 13069 5 2 RAS 09EKV UL RAS 09EAV2 UL ...
Страница 20: ...5 3 RAS 12EKV UL RAS 12EAV UL FILE NO SVM 13069 20 ...
Страница 21: ...FILE NO SVM 13069 5 4 RAS 12EKV UL RAS 12EAV2 UL 21 ...
Страница 164: ...TOSHIBA CARRIER THAILAND CO LTD ENGINEERING DATA BOOK 1 1 Inverter Single Split RAS 09 22EKV UL RAS 09 22EAV2 UL ...