
JKSSS+ Series - 96
JKSSS+ Series
2.3 - 4.2KV
32. The gate and cathode leads are the white wires on the gate drive
board in the medium voltage cabinet. See drawing below.
33. If waveform is inverted, swap Oscilloscope connections for proper
polarity. Close the temporary Start switch and allow the test motor to
reach full speed.
34. Then verify all gating signals to each SCR (two gating signals on
every gate drive board). See drawing below for correct waveform.
35. Once the bad signal(s) are found; write down the location and call
the factory for further guidance.
Waveform is
the gating signal as
measured with an
ungrounded oscilloscope
at the gate to cathode
of the SCR. The
waveform should be 1.7
to 2msec off time and
approximately 1.5 to
3 Vdc. This signal is only
present at full conduction
or the motor is at speed.
Each SCR gating signal
should be checked
in accordance with the
low voltage test procedure.
Содержание JKSSS Plus Series
Страница 2: ......
Страница 6: ...Reference Chart ...
Страница 45: ...JKSSS Series 39 JKSSS Series 2 3 4 2KV 5 1 5 Relay Configuration Setpoint Page 5 ...
Страница 90: ...JKSSS Series 84 JKSSS Series 2 3 4 2KV 7 3 Overload Curve Definition ...
Страница 92: ...JKSSS Series 86 JKSSS Series 2 3 4 2KV 7 5 Typical Wiring Diagram ...
Страница 93: ...JKSSS Series 87 JKSSS Series 2 3 4 2KV ...
Страница 95: ...JKSSS Series 89 JKSSS Series 2 3 4 2KV ...