4
HX7+ ASD Installation and Operation Manual
Installation Precautions
Location and Ambient Requirements
•
The TIC ASD is intended for permanent installations only.
•
Installation should conform to the
National Electrical Code
(NEC)
— Article 110
(
Requirements
For Electrical Installations
), all regulations of the
Occupational Safety and Health
Administration
, and any other applicable national, regional, or industry codes and standards.
Note:
For ALL references to the National Electrical Code (NEC), see the latest release of
the National Electrical Code.
•
Select a mounting location that is easily accessible, has adequate personnel working space, and
adequate illumination for adjustment, inspection, and maintenance of the equipment (refer to the
NEC Article 110-13).
•
DO NOT
mount the ASD in a location that would produce catastrophic results if it were to become
dislodged from its mounting location (equipment damage or injury).
•
DO NOT
mount the ASD in a location that would allow it to be exposed to flammable chemicals or
gases, water, solvents, or other fluids.
•
Avoid installation in areas where vibration, heat, humidity, dust, fibers, metal particles, explosive/
corrosive mists or gases, or sources of electrical noise are present.
•
The installation location shall not be exposed to direct sunlight.
•
Allow proper clearance spaces for installation. Do not obstruct the ventilation openings. Refer to
the section titled
Installation and Connections on pg. 21
for further information on ventilation
requirements.
•
The ambient operating temperature range of the
HX7+ ASD
is 14° to 104° F or 122° F (-10° to
for thermal specifics).
Mounting Requirements
•
Only
Qualified Personnel
should install this equipment.
•
Install the unit in a secure and upright position in a well-ventilated area.
•
As a minimum, the installation of the equipment should conform to the
NEC — Article 110
(NEC), OSHA, as well as any other applicable national, regional, or industry codes and standards.
•
Installation practices should conform to the latest revision of NFPA 70E Electrical Safety
Requirements for Employee Workplaces.
•
It is the responsibility of the ASD installer/maintenance personnel to ensure that the unit is installed
in a manner that will protect personnel against electric shock.
Содержание HX7+ ASD
Страница 1: ...HX7 ASD Install Op Manual TOSHIBA HX7 ASD INSTALLATION OPERATION MANUAL DN 67017 001 February 2014 ...
Страница 2: ...DN 67017 001 February 2014 HX7 ASD Installation Operation Manual ...
Страница 219: ...210 HX7 ASD Installation and Operation Manual Figure 27 66 200 kVA Non Sine Wave NEMA 1 Enclosure ...
Страница 220: ...HX7 ASD Installation and Operation Manual 211 Figure 28 260 518 kVA Non Sine Wave NEMA 1 Enclosure ...
Страница 221: ...212 HX7 ASD Installation and Operation Manual Figure 29 518 1000 kVA Non Sine Wave NEMA 1 Enclosure ...
Страница 222: ...HX7 ASD Installation and Operation Manual 213 Figure 30 1200 1500 kVA Non Sine Wave NEMA 1 Enclosure ...
Страница 223: ...214 HX7 ASD Installation and Operation Manual Figure 31 66 200 kVA Non Sine Wave NEMA 3R Enclosure ...
Страница 224: ...HX7 ASD Installation and Operation Manual 215 Figure 32 260 518 kVA Non Sine Wave NEMA 3R Enclosure ...
Страница 225: ...216 HX7 ASD Installation and Operation Manual Figure 33 518 1000 kVA Non Sine Wave NEMA 3R Enclosure ...
Страница 226: ...HX7 ASD Installation and Operation Manual 217 Figure 34 1200 1500 kVA Non Sine Wave NEMA 3R Enclosure ...
Страница 227: ...218 HX7 ASD Installation and Operation Manual Figure 35 200 kVA Sine Wave NEMA 1 Enclosure ...
Страница 228: ...HX7 ASD Installation and Operation Manual 219 Figure 36 260 518 kVA Sine Wave NEMA 1 Enclosure ...
Страница 229: ...220 HX7 ASD Installation and Operation Manual Figure 37 518 1000 kVA Non Sine Wave NEMA 1 Enclosure ...
Страница 230: ...HX7 ASD Installation and Operation Manual 221 Figure 38 932 1500 kVA Sine Wave NEMA 1 Enclosure ...
Страница 231: ...222 HX7 ASD Installation and Operation Manual Figure 39 200 kVA Sine Wave NEMA 3R Enclosure ...
Страница 232: ...HX7 ASD Installation and Operation Manual 223 Figure 40 260 518 kVA Sine Wave NEMA 3R Enclosure ...
Страница 233: ...224 HX7 ASD Installation and Operation Manual Figure 41 518 1000 kVA Sine Wave NEMA 3R Enclosure ...
Страница 234: ...HX7 ASD Installation and Operation Manual 225 Figure 42 932 1500 kVA Sine Wave NEMA 3R Enclosure ...
Страница 235: ...226 HX7 ASD Installation and Operation Manual Figure 43 66 163 kVA 18 Pulse Enclosure ...
Страница 236: ...HX7 ASD Installation and Operation Manual 227 Figure 44 200 kVA 18 Pulse Enclosure ...
Страница 237: ...228 HX7 ASD Installation and Operation Manual Figure 45 260 518 kVA 18 Pulse Enclosure ...
Страница 238: ...HX7 ASD Installation and Operation Manual 229 Figure 46 518 700 kVA 18 Pulse Enclosure ...