3.6 Startup Procedure
Unified Controller nv Series FL-net Remote I/O Station Module FL654A User's Manual
21
3
3.6.2 AUTO Designation Startup
Begin
(i) Install the power, expansion, FL654A,
and I/O modules in the base unit. When
the expansion unit is used, connect an
expansion cable.
(ii) Connect the communication cable.
(iii) Turn ON the power.
Start up
FL654A switch settings in step (i)
・
Node address: Depends on the system.
・
Talker block head and listener block head:
Depends on the system.
・
RUN/HALT switch: HALT
・
Operation setting switch:
Ethernet setting:
Set according to the system.
Generally, auto-negotiation is set.
I/O composition setting:
I/O module input/output based on
the current I/O module configuration
I/O status setting in down mode:
Depends on the system.
Figure 3-4 AUTO designation startup procedure
Содержание FL654A
Страница 1: ...Unified Controller nv Series FL net Remote I O Station Module FL654A User s Manual 6F8C1625 ...
Страница 16: ...6F8C1625 xiv ...
Страница 38: ...Chapter 3 System Construction 6F8C1625 22 3 ...
Страница 48: ...Chapter 5 I O configuration information 6F8C1625 32 5 ...
Страница 88: ...Chapter 8 Startup Using nV Tool 6F8C1625 72 8 ...
Страница 98: ...Chapter 9 Maintenance Using nV Tool 6F8C1625 82 9 ...
Страница 101: ...85 A 85 Appendix A Specifications A 1 General specifications 86 A 2 FL654A module specifications 87 ...
Страница 105: ...B 89 Appendix B Outside Dimensions ...
Страница 107: ...C 91 Appendix C Accessories and Related Products C 1 Accessories 92 C 2 Related Products 93 ...
Страница 110: ...Appendix C Accessories and Related Products 6F8C1625 94 C ...
Страница 111: ...D 95 Appendix D Decimal hexadecimal Conversion Table ...
Страница 114: ...Appendix D Decimal hexadecimal Conversion Table 6F8C1625 98 D ...
Страница 116: ...1625 1 1810 ...