DP120F/DP125F PBA Outline and Sensor Function
6-18
March 2000 © TOSHIBA TEC
4.3.7 Scanner Cover Open Switch
Fig. 6-4-11
The top cover open switch is installed on side frame R and detects the open or close status of
the top cover.
When the switch is pushed down by the plate of the top cover to turn on the sensor, closing of
the top cover will be detected.
While the top cover open sensor is off, a power supply voltage of 24VSW delivered from the
LVPS and the AC voltage delivered to the fuser are cut off.
Fig. 6-4-10
The scanner cover open switch is installed on side frame L and detects the open or close status
of the scanner cover.
When the switch is pushed down by the hook of the scanner cover to turn on the switch, closing
of the scanner cover will be detected.
4.3.8 Top Cover Open Switch
Scanner cover
Hook
Close
ON
Scanner cover open switch
06-04-10
Close
Plate
ON
Top cover open switch
06-04-11
Содержание DP120F
Страница 1: ...PLAINPAPERFACSIMILE File No 31200001 R0112216901 TTEC ...
Страница 294: ...March 2000 TOSHIBA TEC 6 7 DP120F DP125F PBA Outline and Sensor Function 3 7 PC I F PBA Fig 6 3 8 06 03 08 ...
Страница 311: ...DP120F DP125F Circuit Description 7 2 March 2000 TOSHIBA TEC 07 01 02 Fig 7 1 2 US CA TW models 2 3 ...
Страница 312: ...March 2000 TOSHIBA TEC 7 3 DP120F DP125F Circuit Description Fig 7 1 3 07 01 03 US CA TW models 3 3 ...
Страница 313: ...DP120F DP125F Circuit Description 7 4 March 2000 TOSHIBA TEC Fig 7 1 4 07 01 01E EU AU ASIA HK models 1 3 ...
Страница 314: ...March 2000 TOSHIBA TEC 7 5 DP120F DP125F Circuit Description Fig 7 1 5 07 01 02E EU AU ASIA HK models 2 3 ...
Страница 315: ...DP120F DP125F Circuit Description 7 6 March 2000 TOSHIBA TEC Fig 7 1 6 07 01 03E EU AU ASIA HK models 3 3 ...
Страница 316: ...March 2000 TOSHIBA TEC 7 7 DP120F DP125F Circuit Description 1 2 Block Diagram 07 01 10 Fig 7 1 7 ...
Страница 337: ...DP120F DP125F Circuit Description 7 28 March 2000 TOSHIBA TEC 3 1 Memory Circuit Fig 7 3 1 07 03 01 ...
Страница 387: ...DP120F DP125F Circuit Description 7 78 March 2000 TOSHIBA TEC EU AU ASIA HK models Fig 7 4 2 07 04 00E ...
Страница 401: ...DP120F DP125F Circuit Description 7 92 March 2000 TOSHIBA TEC 07 05 00 Fig 7 5 1 ...
Страница 579: ...March 2000 TOSHIBA TEC 9 15 DP120F DP125F Dialing and Communication Procedure b Standard procedure ...
Страница 654: ...DP120F DP125F Troubleshooting 11 42 March 2000 TOSHIBA TEC 2 3 Flow Chart Recommended for Field Service ...
Страница 655: ...March 2000 TOSHIBA TEC 11 43 DP120F DP125F Troubleshooting 2 4 Flow Chart Recommended for Telephone Screening ...
Страница 656: ...DP120F DP125F Troubleshooting 11 44 March 2000 TOSHIBA TEC ...
Страница 699: ...March 2000 TOSHIBA TEC 12 1 DP120F DP125F Appendix Chapter 12 Appendix 1 Sample List 1 1 Protocol Trace List ...
Страница 700: ...DP120F DP125F Appendix 12 2 March 2000 TOSHIBA TEC 1 2 Error Count List ...
Страница 701: ...March 2000 TOSHIBA TEC 12 3 DP120F DP125F Appendix 1 3 Function List for Maintenance ...
Страница 702: ...DP120F DP125F Appendix 12 4 March 2000 TOSHIBA TEC 1 4 Drum Unit ...
Страница 703: ...March 2000 TOSHIBA TEC 12 5 DP120F DP125F Appendix 1 5 Memory Dump List ...
Страница 706: ...SHUWA SHIBA PARK BLDG A 2 4 1 SHIBA KOEN MINATO KU TOKYO 105 8524 JAPAN ...