Page
33
1
2
3
4
5
6
STEP
27
Route the BALL END of the CABLE (18) up and
around the PULLEYS in the TOP TUBE on the
LEFT SIDE (25) and around the HEAD PLATE
PULLEY (48) above the WEIGHT STACK
Route the CABLE (18) around the horizontal
PULLEY on the LEFT SIDE (25) and over and
around the PULLEY in the TOP DOOR TUBE
(23) of the LEFT DOOR.
Route the CABLE (18) down and around the
TOP PULLEY of the LEFT CARRIAGE (7)
25
48
18
7
23
18
Horizontal PULLEY
67