Page
16
1
2
3
4
5
6
STEP
10
Rotate the ORANGE PADDLE HANDLE on the
LEFT CARRIAGE (7) form vertical to horizontal
and CAREFULLY slide it over the other CAR-
RIAGE UPRIGHT (5) as shown. Release the
PADDLE HANDLE and allow SPRING PIN to
engage one of the holes in the CARRIAGE
UPRIGHT (5)
NOTICE: FOLLOW DIAGRAM EXACTLY TO
ENSURE THAT THE LEFT CARRIAGE (7) IS
CORRECTLY ASSEMBLED TO THE CAR-
RIAGE UPRIGHT (5)
SECURELY
assemble two SPACERS (20) to
the CARRIAGE UPRIGHT (5) as shown using:
Two 3/8 X 3/4" BOLTS W/NP (51)
7
5
20
51 3/8 X 3/4”
W/NP
20
51 3/8 X 3/4”
W/NP