1
Preparing the Machine
No Parts Required
Procedure
1.
Park the machine on a level surface.
2.
Lower the attachments.
3.
Engage the parking brake.
4.
Shut off the engine and remove the key.
2
Removing the Shrouds
No Parts Required
Procedure
1.
Jack up the rear of the machine and position
blocks under the rear wheel motor mounts.
2.
Remove the right rear tire.
3.
Remove the 4 washers and bolts mounting the
control panel to the console (
).
4.
Unplug the wire from the hour meter.
5.
Remove the control panel (
).
6.
Remove the 3 bolts securing the console to the
frame (
). Remove the console by gently
lifting the bottom edge of the console around
the support bracket and sliding it up beyond the
brake handle.
g003660
Figure 1
1.
Control panel
3.
Console mounting bolt
locations
2.
Console
7.
Remove the 4 bolts securing the right hand
wheel shroud to the frame and remove the
shroud (
).
g003661
Figure 2
1.
Right hand wheel shroud
8.
Disconnect and remove the center shroud from
the frame (
3
Содержание Infield Pro 08712
Страница 14: ...g003677 Figure 20 14...
Страница 15: ...Schematics g218266 Hydraulic schematic 108 2946 Rev E 15...
Страница 16: ...Notes...
Страница 17: ...Notes...