2. Conduct a hydrometer test of the battery electrolyte.
IMPORTANT: Make sure the area around the cells is
clean before opening the battery caps.
A. Measure the specific gravity of each cell with a
hydrometer. Draw electrolyte in and out of the
hydrometer barrel prior to taking a reading to warm-
up the hydrometer. At the same time take the tem-
perature of the cell.
B. Temperature correct each cell reading. For each
10
F (5.5
C) above 80
F (26.7
C) add 0.004 to the
specific gravity reading. For each 10
F (5.5
C) be-
low 80
F (26.7
C) subtract 0.004 from the specific
gravity reading.
Example: Cell Temperature
100
F
Cell Gravity
1.245
100
F minus 80
F equals 20
F
(37.7
C minus 26.7
C equals 11.0
C)
20
F
multiply by 0.004/
10
F equals 0.008
(11
C
multiply by 0.004/5.5
C equals 0.008)
ADD (conversion above)
0.008
Correction to 80
F
(26.7
C)
1.253
C. If the difference between the highest and lowest
cell specific gravity is 0.050 or greater or the lowest
cell specific gravity is less than 1.225, charge the bat-
tery. Charge at the recommended rate and time giv-
en in Charging or until all cells specific gravity is
1.225 or greater with the difference in specific gravity
between the highest and lowest cell less than 0.050.
If these charging conditions can not be met, replace
the battery.
3. Perform a high-discharge test with an adjustable
load tester.
This is one of the most reliable means of testing a battery
as it simulates the cold-cranking test. A commercial bat-
tery load tester is required to perform this test.
CAUTION
Follow the manufacturer’s instructions when us-
ing a battery tester.
A. Check the voltage across the battery terminals
prior to testing the battery. If the voltage is less than
12.4 VDC, recharge the battery.
B. If the battery has been charged, apply a 150 amp
load for 15 seconds to remove the surface charge.
Use a battery load tester following the manufactur-
er’s instructions.
C. Make sure battery terminals are free of corrosion.
D. Measure the temperature of the center cell.
E. Connect a battery load tester to the battery termi-
nals following the manufacturer’s instructions.
Connect a digital multimeter to the battery terminals.
F. Apply a test load of one half the Cranking Perfor-
mance (see Battery Specifications) rating of the bat-
tery for 15 seconds.
G. Take a voltage reading at 15 seconds, then re-
move the load.
H. Using the table below, determine the minimum
voltage for the cell temperature reading.
Minimum
Voltage
Battery Electrolyte
Temperature
9.6
70
F (and up)
21.1
C (and up)
9.5
60
F
15.6
C
9.4
50
F
10.0
C
9.3
40
F
4.4
C
9.1
30
F
-1.1
C
8.9
20
F
-6.7
C
8.7
10
F
-12.2
C
8.5
0
F
-17.8
C
I. If the test voltage is below the minimum, replace
the battery. If the test voltage is at or above the mini-
mum, return the battery to service.
Installation
IMPORTANT: To prevent possible electrical prob-
lems, install only a fully charged battery.
1. Make sure ignition and all accessories are off.
2. Make sure battery compartment is clean and re-
painted if necessary.
3. Make sure all battery cables and connections are in
good condition and battery retainer has been repaired
or replaced.
4. Place battery in its compartment. Make sure battery
is level and flat. Connect positive cable connector onto
positive battery post. Tighten cap screw and lock nut
with two wrenches.
5. Secure battery retainer. Do not overtighten to pre-
vent cracking or distorting the battery case.
6. Apply a light coat of skin-over grease on all battery
posts and cable connectors to reduce corrosion after
connections are made.
Содержание 00075SL
Страница 2: ...Reelmaster 5500 D ...
Страница 4: ...Reelmaster 5500 D ...
Страница 6: ...Reelmaster 5500 D ...
Страница 12: ...0 09375 Rev D Reelmaster 5500 D Page 2 2 Product Records and Maintenance Equivalents and Conversions ...
Страница 49: ...Hydraulic System Reelmaster 5500 D Hydraulic System Rev C Page 4 11 This page is intentionally blank ...
Страница 64: ...Reelmaster 5500 D Hydraulic System Rev C Page 4 26 This page is intentionally blank ...
Страница 89: ...Hydraulic System Reelmaster 5500 D Hydraulic System Rev C Page 4 51 This page is intentionally blank ...
Страница 109: ...Hydraulic System Reelmaster 5500 D Hydraulic System Rev C Page 4 71 This page is intentionally blank ...
Страница 115: ...Hydraulic System Reelmaster 5500 D Hydraulic System Rev C Page 4 77 This page is intentionally blank ...
Страница 170: ...Reelmaster 5500 D Page 5 40 Electrical System Rev C ...
Страница 192: ...Reelmaster 5500 D Differential Axle Page 6 22 ...
Страница 254: ...Reelmaster 5500 D Groomer Rev C Page 8 1 14 ...
Страница 278: ...Reelmaster 5500 D Page 10 2 Electrical Diagrams Rev C ...
Страница 284: ...Rev C Page 10 8 Harness Drawing Reelmaster 5500 D Serial Number 210000401 to 210999999 ...
Страница 285: ...Rev C Page 10 9 Harness Diagram Reelmaster 5500 D Serial Number 210000401 to 210999999 ...
Страница 286: ...Rev C Page 10 10 Harness Drawing Reelmaster 5500 D Serial Number 220000001 to 220999999 ...
Страница 287: ...Rev C Page 10 11 Harness Diagram Reelmaster 5500 D Serial Number 220000001 to 220999999 ...
Страница 288: ...Rev C Page 10 12 Harness Drawing Reelmaster 5500 D Serial Number Above 230000000 ...
Страница 289: ...Rev C Page 10 13 Harness Diagram Reelmaster 5500 D Serial Number Above 230000000 ...
Страница 290: ...Reelmaster 5500 D ...