2 - Operation and maintenance
21
TO320 M - EN - Ed. 04.09
Pneumatic VDC
12.3
Disassembly order
12.3.1
Guard disassembly
12.3.1.1
1. Disconnect all the electrical and pneumatic sup
-
ply connections;
2. Remove screw (23) and washers (22-21) which
fix the pneumatic control unit (25) and guard (24)
to drive unit support (16);
26
24
25
22
23
21
14
15
20
19
18
17
16
18
19
20
Solo per
VDC400-500
15
14
Part. A
Part. A
Disassembling the cylinders support
12.3.1.2
1. Slacken screws (14) which fix the cylinder sup
-
port (15) to the reduction gear plate (16);
2. Slacken screws (20) (from the drive-unit support
side) and washers (19-18) and remove drive unit
support (20), remove screws (16) (from the stud
bolts side) and washers (19-18) and stud bolts
(17);
Содержание VDC 200
Страница 1: ...VDC Double dump valve EN TO320 EN Ed 04 09 ...
Страница 7: ...TECHNICAL CATALOGUE TO320 T EN Ed 04 09 1 VDC Double dump valve EN ...
Страница 24: ......
Страница 25: ...VDC Double dump valve EN OPERATION AND MAINTENANCE TO320 M EN Ed 04 09 2 ...
Страница 66: ......
Страница 67: ...SPARE PARTS CATALOGUE VDC Double dump valve EN TO320 R EN Ed 04 09 3 ...
Страница 76: ...10 3 Spare Parts Catalogue TO320 R EN Ed 04 09 Plate 2 Counterweight 2 1 2 4 2 3 5 ...