2 - Operation and maintenance
29
TO320 M - EN - Ed. 04.09
Order for mounting the cylinders on the body
12.6.3
1. Position the rear support (15) on the holes
present on the drive unit plate (16);
2. Fit screws (14) on drive unit plate (16) for fixing
the rear cylinder support (15)
3. Insert pin (4) in the hole on lever (1);
4. Fix pin (4) to lever (1) by means of self-locking
nut (3).
Carry out the following operations for the second
cylinder.
CHECK CAREFULLY: when the cylinders are in the retracted position, the valve flaps must be
closed and the cylinder must have a 10mm override
(see Figure below)
14
3
15
4
16
1
Содержание VDC 200
Страница 1: ...VDC Double dump valve EN TO320 EN Ed 04 09 ...
Страница 7: ...TECHNICAL CATALOGUE TO320 T EN Ed 04 09 1 VDC Double dump valve EN ...
Страница 24: ......
Страница 25: ...VDC Double dump valve EN OPERATION AND MAINTENANCE TO320 M EN Ed 04 09 2 ...
Страница 66: ......
Страница 67: ...SPARE PARTS CATALOGUE VDC Double dump valve EN TO320 R EN Ed 04 09 3 ...
Страница 76: ...10 3 Spare Parts Catalogue TO320 R EN Ed 04 09 Plate 2 Counterweight 2 1 2 4 2 3 5 ...