
2 - Operation and maintenance
27
TO320 M - EN - Ed. 04.09
Pneumatic VDC
12.6
Levers assembly order
12.6.1
1. Insert lever (1) in the double dump valve shaft, checking to make sure the key is centred with
respect to the lever;
2. Fit grub screw (2) on lever (1) to lock it;
3. Position the stud bolts (17) on the valve body and fit screws (20) (RH screw in drawing) together
with washers (19-18);
4. Position the drive unit support plate (18) on stud bolts (17) and fit screws (20) (LH screw in draw
-
ing) together with washers (19-18).
Repeat points 1 and 2 also for the second lever!!!
1
2
20
19
18
17
16
18
19
20
Содержание VDC 200
Страница 1: ...VDC Double dump valve EN TO320 EN Ed 04 09 ...
Страница 7: ...TECHNICAL CATALOGUE TO320 T EN Ed 04 09 1 VDC Double dump valve EN ...
Страница 24: ......
Страница 25: ...VDC Double dump valve EN OPERATION AND MAINTENANCE TO320 M EN Ed 04 09 2 ...
Страница 66: ......
Страница 67: ...SPARE PARTS CATALOGUE VDC Double dump valve EN TO320 R EN Ed 04 09 3 ...
Страница 76: ...10 3 Spare Parts Catalogue TO320 R EN Ed 04 09 Plate 2 Counterweight 2 1 2 4 2 3 5 ...