2 - Operation and maintenance
TO320 M - EN - Ed. 04.09
INSTALLATION
10.
Mechanical connections
10.1
Before carrying out any operation on the machine, make sure it is in safety condition!
The machine is delivered completely assembled, and only needs to be installed and bolted firmly to
the valve inlet flange and (if envisaged for the plant) also to the outlet flange.
Loading flange
Unloading flange
The double dump valve can be fixed in different ways: in any case, the valve is designed for being
fixed using both the upper and lower flanges.
EXAMPLES OF APPLICATION
VDC under small silo
VDC under hopper
Содержание VDC 200
Страница 1: ...VDC Double dump valve EN TO320 EN Ed 04 09 ...
Страница 7: ...TECHNICAL CATALOGUE TO320 T EN Ed 04 09 1 VDC Double dump valve EN ...
Страница 24: ......
Страница 25: ...VDC Double dump valve EN OPERATION AND MAINTENANCE TO320 M EN Ed 04 09 2 ...
Страница 66: ......
Страница 67: ...SPARE PARTS CATALOGUE VDC Double dump valve EN TO320 R EN Ed 04 09 3 ...
Страница 76: ...10 3 Spare Parts Catalogue TO320 R EN Ed 04 09 Plate 2 Counterweight 2 1 2 4 2 3 5 ...