UM-3
Smart System
Driving belt replacement
Head removal
First of all carry out the operations indicated at the points
1 - 2 for both ends of the carriage
3) Remove the drive belt from both ends of the carriage (Fig. 5)
and pull off (Fig. 6). To re-assemble the belt, carry out
the same operations in the opposite way repositioning the
belt tensioner at the initial distance X.
Take particular care to center the belt with regard to
both the running seat and the blocking position of the
belt tensioner.
First of all carry out the operations indicated at points 1
4 Unscrew the four screws on the flange (Fig. 7) and remove
the head
5) In order to re-assemble the head, repeat the operations
above in reverse order.
Fig. 6
Fig. 7
Sliding block replacement
First of all carry out the operations indicated at the points
1 - 2 on the side of the block to be replaced
6) The head on the same side of the block wich has to be re-
placed must be detached from the profile. Follow the steps 4-5.
Fig. 8
Fig. 9
7) Remove the fixing screws on the top of the carriage (Fig. 8).
8) Pull off the sliding block (Fig. 9). To re-assemble the sliding
blocks, carry out the same operations in the opposite way.
Содержание ROLLON R-SMART 120
Страница 1: ...Smart System Use and maintenance Actuator Line Smart system R Smart...
Страница 2: ......