September 6, 2006
K2 Storage System Instruction Manual
141
Level 2R system power-on procedure
approximately 30 seconds for the disk drives to spin down before proceeding.
9. Power-off all Ethernet switches.
10.Power-off the control point PC and/or the NetCentral server PC, if necessary.
Level 2R system power-on procedure
Use the following steps to power-on the Level 2R storage system
.
Device
Verification instructions
1.
Power-on the control point
PC and/or the NetCentral
server PC.
After log on, start NetCentral. NetCentral reports devices as
offline. As each device is powered on, check NetCentral to verify
the device’s status.
2.
Power-on the Ethernet
switches.
This description is for the HP
ProCurve switch.
The switch performs its diagnostic self test, which takes
approximately 50 seconds to complete. LED Behavior during the
self test is as follows:
•
Initially, all the status, LED Mode and port LEDs are on
for most of the duration of the test.
•
Most of the LEDs go off and then may come on again
during phases of the self test. For the duration of the self
test, the Test LED stays on.
When the self test completes successfully, the Power and Fan
Status LEDs remain on, the Fault and Test LEDs go off, and the
port LEDs on the front of the switch go into their normal
operational mode, which is as follows:
•
If the ports are connected to active network devices, the
LEDs behave according to the LED Mode selected. In the
default view mode (Link), the LEDs should be on.
•
If the ports are not connected to active network devices,
the LEDs will stay off.
If the LED display is different than what is described above,
especially if the Fault and Test LEDs stay on for more than 60
seconds or they start blinking, the self test has not completed
correctly. Refer to the manual you received with the switch for
troubleshooting information.
3.
Power-on RAID storage
devices.
Power-on expansion chassis (if present) prior to or simultaneous
with the power-on for the main Fibre Channel chassis.
NOTE: Always power-on the RAID Expansion
chassis prior to, or simultaneously with the
RAID Controller chassis.
Verify that start-up indicators show normal start-up processes, as
follows:
•
Wait until all disk access LEDs are steady —
approximately 4 minutes.
•
The controller READY LED is ON
•
The controller DIR LED flashes green
•
The front Power LED is ON
•
The front Service LED is OFF
Refer to the
L2 RAID
Instruction Manual to interpret other
disk access LED or status LED behavior.
Содержание K2
Страница 1: ...K2 STORAGE SYSTEM Instruction Manual SOFTWARE VERSION 3 1 071 8461 01 SEPTEMBER 2006 ...
Страница 14: ...14 K2 Storage System Instruction Manual September 6 2006 Safety Summaries ...
Страница 20: ...20 K2 Storage System Instruction Manual September 6 2006 Finding Information ...
Страница 24: ...24 K2 Storage System Instruction Manual September 6 2006 Chapter 1 Product Description ...
Страница 94: ...94 K2 Storage System Instruction Manual September 6 2006 Chapter 3 Installing the Level 2 Storage System ...
Страница 148: ...148 K2 Storage System Instruction Manual September 6 2006 Chapter 4 Installing the Level 2R Storage System ...
Страница 254: ...254 K2 Storage System Instruction Manual September 6 2006 Chapter 6 Installing the Level 3R Storage System ...
Страница 296: ...296 K2 Storage System Instruction Manual September 6 2006 Chapter 7 Installing the Nearline Storage System ...