42
Battery Connection
NOTE: If the vehicle is equipped with a battery disconnect switch, always
wire the unit after the switch. This allows power to the unit to be turned
off by the battery disconnect switch.
1. Pass electrical wires CHA (black), 01, BAT and 2 (brown) to the
battery.
2. Using the recommended tools, cut the wires
to the proper length.
Do not coil or splice the excess wire.
3. Strip the wires and position the terminals supplied with the
recommended tools.
4. DISCONNECT THE CLAMP FROM THE BATTERY’S NEGATIVE
TERMINAL.
5. Connect wire 2 to one end of the fuse FP fuse holder (both supplied by
Thermo King) and connect the other end of the fuse holder to the
battery's positive pole. Install fuse FP (100A/12V or 60A/24V) in the
fuse holder. See note above.
6. Connect the *wire (wire between the battery and the vehicle starter
key) and the BAT wire to one end of the fuse F14 fuse holder (both
supplied by Thermo King), and connect the other end of the fuse holder
to the battery’s positive pole. Install fuse F14 (5A) in the fuse holder.
If F14 cannot be connected to the *wire, connect an additional fuse
(5A) between wire 01 and the vehicle starter key.
7. Connect the CHA wire to the clamp of the battery’s negative pole.
8. Reconnect the clamp of the battery’s negative terminal.
Содержание B-100-10
Страница 9: ...9 Required Tools...
Страница 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Страница 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Страница 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Страница 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Страница 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Страница 23: ...23 Preparing Refrigeration Hoses T 10 min...
Страница 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Страница 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Страница 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Страница 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Страница 33: ...33 Circuit Seal Test...
Страница 35: ...35 In Case of Leaks 250 psig...
Страница 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Страница 39: ...39 Optional Internal DIN Adaptor T 5 min...
Страница 41: ...41 Control Cable Connection T 5 min...
Страница 43: ...43 Battery Connection T 15 min...
Страница 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Страница 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Страница 49: ...49 Installing the Deflector T 5 min...
Страница 51: ...51 Installing the Hose Covers T 12 min...
Страница 57: ...57 Charging the Circuit...
Страница 58: ...58 Outline Drawings...
Страница 59: ...59 Outline Drawings...
Страница 60: ...60 Outline Drawings...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64...