56
Charging the Circuit
1. Connect the gauge manifold to the suction and discharge line intakes of
the condenser unit.
2. Connect the refrigerant bottle to the gauge manifold and place it on a
set of scales.
3. Open the refrigerant bottle valve and
drain the gauge fitting line
.
4. Keep the low pressure side valve of the gauge manifold closed. Open
the high pressure side valve.
5. Add refrigerant until reaching approximately
0.95 kg/2.1 lb of R-134a.
6. Close the refrigerant bottle valve and the high side valve of the gauge
manifold.
7. Start the vehicle engine running at around 1000 rpm and switch on the
unit.
8. Set the unit thermostat at 0ºC/32ºF (see operating manual).
9. Run the unit until it reaches a temperature close to that indicated, and a
high circuit pressure of 12.5 bar / 180 psig for R-134a
. Partially
close the air intake to the condenser if necessary.
10. Open the low side valve of the gauge manifold and the refrigerant
bottle valve, and add refrigerant slowly until no bubbles can be seen
through the liquid sight glass.
11. Close the refrigerant bottle and gauge manifold valves.
12. Leave the unit running for 15 minutes.
13. Only if you are installing a unit without electrical standby, turn off the
unit, stop the vehicle and remove the gauge manifold.
Содержание B-100-10
Страница 9: ...9 Required Tools...
Страница 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Страница 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Страница 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Страница 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Страница 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Страница 23: ...23 Preparing Refrigeration Hoses T 10 min...
Страница 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Страница 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Страница 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Страница 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Страница 33: ...33 Circuit Seal Test...
Страница 35: ...35 In Case of Leaks 250 psig...
Страница 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Страница 39: ...39 Optional Internal DIN Adaptor T 5 min...
Страница 41: ...41 Control Cable Connection T 5 min...
Страница 43: ...43 Battery Connection T 15 min...
Страница 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Страница 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Страница 49: ...49 Installing the Deflector T 5 min...
Страница 51: ...51 Installing the Hose Covers T 12 min...
Страница 57: ...57 Charging the Circuit...
Страница 58: ...58 Outline Drawings...
Страница 59: ...59 Outline Drawings...
Страница 60: ...60 Outline Drawings...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64...