3
Introduction
This installation manual was written to help assist with the installation of Thermo King refrigeration units powered by vehicle batteries onto either a truck or
a van. The manual comprises sections on condenser, evaporator and other modules that are mounted on the truck or van body, as well as sections on
components and wiring that are to be connected to the vehicle engine from which the unit derives power. Due to its complexity, do not attempt this installation
unless you:
•
Are an experienced mechanic.
•
Can safely lift 34 kg (75 lb.).
•
Are certified or approved in the repair and maintenance of transport refrigeration systems.
•
Have a basic understanding of electricity and electrical wiring.
•
Have the necessary tools and equipment to complete the installation.
•
Have a truck body designed and built to meet the requirements of this installation.
This manual is published for informational purposes only. Thermo King makes no representations or warranties, express or implied, with respect to the
information, recommendations and descriptions contained herein. Information provided should not be regarded as all-inclusive or covering all contingencies.
If further information is required, Thermo King Corporation Service Department should be contacted.
Thermo King’s warranty shall not apply to any equipment which has been “so installed, maintained, repaired or altered as, in the manufacturer’s judgment, to
affect its integrity”.
Manufacturer shall have no liability to any person or entity for any personal injury, property damage or any other direct, indirect, special, or
consequential damages whatsoever, arising out of the use of this manual or any information, recommendations or descriptions contained herein.
Содержание B-100-10
Страница 9: ...9 Required Tools...
Страница 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Страница 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Страница 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Страница 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Страница 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Страница 23: ...23 Preparing Refrigeration Hoses T 10 min...
Страница 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Страница 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Страница 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Страница 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Страница 33: ...33 Circuit Seal Test...
Страница 35: ...35 In Case of Leaks 250 psig...
Страница 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Страница 39: ...39 Optional Internal DIN Adaptor T 5 min...
Страница 41: ...41 Control Cable Connection T 5 min...
Страница 43: ...43 Battery Connection T 15 min...
Страница 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Страница 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Страница 49: ...49 Installing the Deflector T 5 min...
Страница 51: ...51 Installing the Hose Covers T 12 min...
Страница 57: ...57 Charging the Circuit...
Страница 58: ...58 Outline Drawings...
Страница 59: ...59 Outline Drawings...
Страница 60: ...60 Outline Drawings...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64...