11
Unpacking and Inspecting the Unit
Unpacking the Unit
1. Open the packaging.
2. Find the unit documentation.
3. Verify that the packaging contains all the accessories indicated on the
list attached with the documentation.
4. Check that the hose length is correct before starting the installation.
Checking can be carried out by consulting the “Packing List” included
with the unit documentation.
Inspecting the Unit
1. Open the condenser unit cover and ensure the following:
•
Neither the cover nor the unit should show any shock damage
or imperfections.
•
The condenser battery should be charged with helium gas.
•
The voltage of all the electrical components is correct (12/24V).
2. Open the evaporator unit cover and make the following checks:
•
Neither the cover nor the unit should show any shock damage
or imperfections.
•
The evaporator battery should be charged with helium gas.
•
The voltage of all the electrical components is correct (12/24V).
Содержание B-100-10
Страница 9: ...9 Required Tools...
Страница 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Страница 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Страница 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Страница 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Страница 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Страница 23: ...23 Preparing Refrigeration Hoses T 10 min...
Страница 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Страница 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Страница 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Страница 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Страница 33: ...33 Circuit Seal Test...
Страница 35: ...35 In Case of Leaks 250 psig...
Страница 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Страница 39: ...39 Optional Internal DIN Adaptor T 5 min...
Страница 41: ...41 Control Cable Connection T 5 min...
Страница 43: ...43 Battery Connection T 15 min...
Страница 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Страница 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Страница 49: ...49 Installing the Deflector T 5 min...
Страница 51: ...51 Installing the Hose Covers T 12 min...
Страница 57: ...57 Charging the Circuit...
Страница 58: ...58 Outline Drawings...
Страница 59: ...59 Outline Drawings...
Страница 60: ...60 Outline Drawings...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64...