30
Drain Circuit in the ES100 Evaporator
1. Cut the drain hose to the required length.
2. Connect the hose to the drain tube. Secure connections with plastic
flanges.
3. Route the hose through the drain hole and seal hermetically.
4. Check that the corresponding siphon or moisture trap is installed at the
end of each drain hose. If not, install it.
Содержание B-100-10
Страница 9: ...9 Required Tools...
Страница 13: ...13 Installing the Condenser Unit roof mounted ASA052 T 10 min...
Страница 15: ...15 Installing the Condenser Unit roof mounted T 12 min...
Страница 17: ...17 Installing the Condenser Unit front mounted T 10 min...
Страница 19: ...19 Installing the Condenser Unit front mounted C T 15 min...
Страница 21: ...21 Installing the ES100 Evaporator Unit T 20 min...
Страница 23: ...23 Preparing Refrigeration Hoses T 10 min...
Страница 25: ...25 Connecting Hoses to the Condenser Unit T 10 min...
Страница 27: ...27 Connecting Hoses to the ES100 Evaporator T 14 min...
Страница 29: ...29 Electrical Connections in the ES100 Evaporator T 10 min...
Страница 31: ...31 Drain Circuit in the ES100 Evaporator T 5 min...
Страница 33: ...33 Circuit Seal Test...
Страница 35: ...35 In Case of Leaks 250 psig...
Страница 37: ...37 Installing the In Cab Control 1 3 T 10 min...
Страница 39: ...39 Optional Internal DIN Adaptor T 5 min...
Страница 41: ...41 Control Cable Connection T 5 min...
Страница 43: ...43 Battery Connection T 15 min...
Страница 45: ...45 Fitting the Power Supply Units with Electric Standby T 10 min...
Страница 47: ...47 Door Switch Connection DSW1 CHW T 1 min...
Страница 49: ...49 Installing the Deflector T 5 min...
Страница 51: ...51 Installing the Hose Covers T 12 min...
Страница 57: ...57 Charging the Circuit...
Страница 58: ...58 Outline Drawings...
Страница 59: ...59 Outline Drawings...
Страница 60: ...60 Outline Drawings...
Страница 61: ...61...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64...