44
NORMAL SEQUENCE OF OPERATION
Limits and operating controls such as safety and operating temperature limits,
water flow switch, thermal fuse switches and high/low gas pressure switch
contacts must be closed to initiate and continue burner sequence. Flame
signal must not be present. Airflow switch must be open.
Control terminal 5 is energized and all safety and operating control contacts
are closed. Control terminal 4 is energized to start the combustion air fan.
Contacts close when fan generates enough differential air pressure to actuate
combustion air flow switch diaphragm.
Fan purges combustion chamber and venting for 30 seconds.
Pilot gas valve(s) and ignition transformer are energized. Pilot gas flows to
pilot burner and is ignited.
Ignition transformer is de-energized after 5 seconds. Presence of pilot flame
is detected by ultraviolet scanner. Flame signal exceeds 1.5 volts DC.
Main gas valves are energized. Gas flows to main burner and is ignited by
pilot flame. Pilot and main flames are detected by ultraviolet scanner. Flame
signal continues to maintain 1.5 to 5.0 volts DC.
After 5 seconds, pilot gas valve(s) is de-energized. Gas flow to pilot stops.
Pilot flame is extinguished. Main flame is detected by ultraviolet scanner.
Flame signal continues to maintain 1.5 to 5.0 volts DC.
Main burner continues to operate until call for heat ends, contacts of a safety
or operating control open, electrical power is interrupted, or the flame signal
drops below 1.5 volts DC. Modulating boilers operate based on the load,
determined by the difference between the bulk boiler water temperature and
the boiler water set point.
Main gas valves are de-energized. Gas flow to main burner stops. Main
flame is extinguished. Fan continues to operate for 60 seconds to EVOcuate
combustion chamber and venting.
Boiler in Standby
Call for Heat
Combustion Air Flow Switch
Contacts Make
Pilot Flame Establishing
Period Begins
Early Spark Termination
Main Flame Establishing
Period Begins
Run Period Begins
Run Period
Post Purge
Standby
30 sec.
5 sec.
5 sec.
3 sec.
Prepurge Begins
After 60 seconds fan stops.
VI. Boiler Operational Sequence
Содержание EVO-1000
Страница 12: ...12 Figure 3 Sidewall Positive Pressure Venting Optional Figure 2 Sidewall Positive Pressure Venting...
Страница 13: ...13 Figure 4 Vertical Pressurized Venting...
Страница 15: ...15 Figure 5 Typical Negative Pressure Conventional Venting...
Страница 17: ...17 Figure 7 Vertical Air Intake Piping...
Страница 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram on off EVO 500 2000...
Страница 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation EVO 500 2000...
Страница 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Страница 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Страница 32: ...32 Figure 13 Modular System Typical One Pipe Water Piping...
Страница 33: ...33 Figure 14 Modular System Typical Primary Secondary Water Piping...
Страница 34: ...34 Figure 15 Modular System Typical Primary Secondary without System Pump...
Страница 35: ...35 Figure 16 Modular System Typical Reverse Return Water Piping...
Страница 36: ...36 Figure 17 Modular System Reverse Return with System Pump Only...
Страница 37: ...37 Figure 18 Modular System Typical Primary Secondary with Reverse Return...
Страница 47: ...47 This Page Intentionally Left Blank...
Страница 48: ...48 Troubleshooting Guide B Troubleshooting Guide...
Страница 49: ...49 Troubleshooting Guide...
Страница 53: ...53 This Page Intentionally Left Blank...
Страница 54: ...54 Figure 19 Combustion Chamber Assembly...
Страница 56: ...56 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Страница 58: ...58 Figure 21 UL FM CSD 1 Main Gas Train Assembly...
Страница 60: ...60 Figure 22a DB B DB B w POC Gas Train 500 750 Figure 22b DB B DB B w POC Gas Train 1000 2000...
Страница 62: ...62 Figure 23 Jacket Panels 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Страница 64: ...64 Figure 24a Control Panel Assembly On Off...
Страница 66: ...66 Figure 24b Control Panel Assembly Modulation...
Страница 68: ...68 Figure 25 Bishop Pilot Assembly...
Страница 72: ...72 NOTES...
Страница 73: ...73 NOTES...
Страница 74: ...74 NOTES...
Страница 75: ...75 NOTES...