BHT-206L3-MM-1
5-00-00
Page 46
Rev. 16 25 FEB 2011
ECCN EAR99
2.
Examine skid shoes for condition and security.
3.
Examine skid tube saddles for corrosion, damage, and
security.
4.
Examine ground handling wheel attachment bolts for
condition and security.
GROUND RUN
CAUTION
G R O U N D R U N O F H E L I C O P T E R T O B E
ACCOMPLISHED BY QUALIFIED PERSONNEL
ONLY.
Chapter 12
1.
Make sure applicable servicing requirements have been
carried out.
2.
Check oil level of transmission, hydraulic tank, engine and
rail rotor gearbox prior to running helicopter.
3.
Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206L3-FM-1
(BHT-206L4-FM-1 for
206L3+ IGW
Upgrade)
4.
Start the helicopter and conduct ground run at 100% N
R
to
check for leaks and ensure all systems are operational and
parameters are within Flight Manual limitations.
Chapter 96
5.
Check the voltage regulator setting.
PROGRESSIVE INSPECTIONS
5-19.
100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 4 (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Содержание Bell 206L3
Страница 10: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 48: ......
Страница 70: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 114: ......
Страница 120: ......
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......
Страница 166: ......
Страница 172: ......
Страница 176: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 204: ......
Страница 210: ......
Страница 226: ......
Страница 230: ......