BHT-206L3-MM-1
5-00-00
ECCN EAR99
Chapter 96
ELECTRICAL
1.
Examine all visible electrical components, wires, cables,
and connectors in the area of the tailboom for chafing, and
general condition and security.
2.
Verify navigation lights and anti-collision light for operation,
condition, and security.
Chapter 97
3.
Examine antennas for condition and security.
GROUND RUN
CAUTION
G R O U N D R U N O F H E L I C O P T E R T O B E
ACCOMPLISHED BY QUALIFIED PERSONNEL
ONLY.
Chapter 12
1.
Make sure applicable servicing requirements have been
carried out.
2.
Check oil level of transmission, hydraulic tank, engine and
rail rotor gearbox prior to running helicopter.
3.
Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206L3-FM-1
(BHT-206L4-FM-1 for
206L3+ IGW
Upgrade)
4.
Start the helicopter and conduct ground run at 100% N
R
to
check for leaks and ensure all systems are operational and
parameters are within Flight Manual limitations.
PROGRESSIVE INSPECTIONS
5-18.
100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 3 (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
25 FEB 2011 Rev. 16
Page 37/38
Содержание Bell 206L3
Страница 10: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 48: ......
Страница 70: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 114: ......
Страница 120: ......
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......
Страница 166: ......
Страница 172: ......
Страница 176: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 204: ......
Страница 210: ......
Страница 226: ......
Страница 230: ......