BHT-206L3-MM-1
5-00-00
ECCN EAR99
SCHEDULED INSPECTIONS
5-39.
600 HOURS OF COMPONENT OPERATION
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:_______________
_________________________
TRANSMISSION
NOTE
This inspection is applicable to transmission
assemblies 206-706-045-103, 206-706-045-107, and
206-706-045-111. FPI not required for transmission
assembly 206-706-045-107 with top case
206-040-550-101 (TB 206L-92-163).
BHT-206-SI-2039
If increased power operation kit is installed, inspect
transmission following directives provided in BHT-206-SI-2039.
25 FEB 2011 Rev. 16
Page 125/126
Содержание Bell 206L3
Страница 10: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 48: ......
Страница 70: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 114: ......
Страница 120: ......
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......
Страница 166: ......
Страница 172: ......
Страница 176: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 204: ......
Страница 210: ......
Страница 226: ......
Страница 230: ......