BHT-206L3-MM-1
5-00-00
ECCN EAR99
SCHEDULED INSPECTIONS
5-35.
12 MONTHS OF COMPONENT OPERATION
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:_______________
_________________________
Chapter 62
BHT-206A/B/L-Series-
CR&O
MAIN ROTOR MAST
1.
Inspect mast assembly as follows:
a.
Remove mast nut, flap restraint kit, and cap plug. With
the help of a bright light, inspect internal surface (internal
diameter) of mast for corrosion and condition of protective
coating.
b.
Install cap plug, flap restraint kit, and mast nut.
2.
Check mast nut for torque after 1 to 5 hours of flight
operation (TB 206L-07-223).
1 JUN 2012 Rev. 19
Page 115/116
Содержание Bell 206L3
Страница 10: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 48: ......
Страница 70: ......
Страница 80: ......
Страница 86: ......
Страница 94: ......
Страница 114: ......
Страница 120: ......
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 162: ......
Страница 166: ......
Страница 172: ......
Страница 176: ......
Страница 178: ......
Страница 180: ......
Страница 186: ......
Страница 192: ......
Страница 204: ......
Страница 210: ......
Страница 226: ......
Страница 230: ......