
Apr-08-2016 GI-50 320 DS (NZ308)_UL April 2016
Page 19
Texmate, Inc. Tel. (760) 598-9899 • www.texmate.com
Initial Setup Procedures
[CodE_1] - Display Configuration continued
Use the
buttons to
cycle through the Registers
Menu and Registers (1 to
244) to select data source for
displays (also see page 36).
Programming Tip
To enter the Main Programming Mode press the
P
and buttons at the same time. To exit and
return to the operational display, press the
P
and buttons again at the same time.
At the end of any procedure (Step 8 in this pro-
cedure) the
P
must be pressed before the
P
and buttons are pressed,otherwise the meter
returns to the operational display without saving
the new settings.
Select Data Source
P
[rESLt]
[Ch1]
[Ch2]
[Ch3]
[Ch4]
[tot_1]
[tot_2]
[PEAK]
[tArE]
[VALEY]
[diSP]
[ 1]
[ 10]
[100]
[200]
[244]
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
X
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
X
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
Step 1
Step 2
Step 3
Operational Display
Operational Display
Example
Press
2
Press
at same
time
Press
at same
time
Press
1
OR
Step 4
Press
at same
time
Press
at same
time
Step 6
0 Primary Display
1 Second Display (See Note)
2 Third Display (See Note)
3 Peak/Valley
4 Analog Output 1
5 Analog Output 2
6 Totalizer 1
7 Totalizer 2
OR
OR
Step 7
Step 8
Step 9
Press
1
Press
1
From Step 5
Step 5
Select [diSP] as the Data Source
from the options listed in the Select
Data Source diagram below.
CONFIGURING THE DATA SOURCE PROCEDURE
Set Code 1 to [X50]:
1st Digit = X Note relevant
2nd Digit = 5 Selects data source mode
3rd Digit = 0 Selects Primary Display
Select [000] to leave
Code 1
Save Data Source
setting
Exit Code 2. Return to
Operational Display
Enter Brightness
Mode
Pass Brightness and
Calibration Modes
and enter Code 1
SP1 SP2 SP3 SP4 SP5 SP6
Prog.
CONFIGURE
DATA SOURCE
Programming Tip
Pressing the
and
buttons at the same time
increases the displayed
parameter in increments
of 100 counts.
Programming Tip
Pressing the
button reaches
[000] faster.
START HERE
Example Procedure:
Configure the Primary Display with the display [diSP] as the
data source by setting Code 1 to [
X50
]. See diagram at the
bottom of the page for data source selection options.
Configure Data Source Procedure
The following example procedure describes how to select the
source of the data to be displayed for the third digit selection.
Note:
Options 1 and 2 listed for the 3rd digit in Step 3 above are
only for use with meters that have more than one display. With
bargraph meters the PRIMARY display is the digital display,
and the SECONDARY display is the bargraph display.