August 2016
3 - 10
AL4 • AL4000
Part No. 218567
Section 3 • Scheduled Maintenance Procedures
A-11
Perform Engine Maintenance -
Kubota Models
Engine specifi cations require that this procedure
be performed every 50 hours or weekly, whichever
comes fi rst.
• Check fuel lines and clamps
Required maintenance procedures and additional
engine information is available in the
Kubota D1105 Operator's Manual
(Kubota part number 16622-89166) OR the
Kubota D1105 Operator's Manual
Genie part number
131379
A-10
Perform Generator Maintenance
Leroy Somer Models
Generator specifi cations require that this
procedure be performed every 40 hours or weekly,
whichever comes fi rst.
Maintaining the generator in good condition is
essential to safe machine operation and long
service life. Storing the generator in a harsh
environment may require this procedure be
performed more frequently. Allowing dirt and
grease to build up on the generator may result in a
generator which will run hotter, lose effi ciency, and
reduce the life of the generator.
• Clean and inspect the generator exterior
• Clean or replace the generator air fi lters -
(if equipped)
Leroy Somer Manual
Genie part number
116118
CHECKLIST A PROCEDURES
Discount-Equipment.com