![Telenetics Corporation FT100 S Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/telenetics-corporation/ft100-s/ft100-s_installation-and-operation-manual_1082085042.webp)
Front Panel Option Selection
4-14
FT 100S
The loop-up and loop-down codes are compatible with AT&T and ANSI
inband loop codes. Therefore, the remote unit can be another FT 100S or
a standard CSU device.
Loop-up set code -- repeating bit pattern 10000. Loop-down reset code -
- repeating bit pattern 100.
All TM LEDs light to indicate a T1 test is in progress. Other LEDs func-
tion normally.
PUSHBUTTON ACTION:
YES-
Initiates Remote CSU loopback; advances to Remote CSU
Loop in progress - End?
NO/
HOME-
Returns to T1 Test? submenu
Test In Progress
This display indicates a test is in progress.
XXX
represents the particular
test mode.
PUSHBUTTON ACTION:
YES-
Terminates the test
NO-
Advances to next test menu
HOME-
Returns to top of the present test menu
DTE PORT TESTS
This submenu display accesses these DTE port test modes:
•
Local Terminal Loopback
•
Remote Terminal Loopback
•
Remote Loopback
XXX
In Progress-End?
DTE Port Tests?
Содержание FT100 S
Страница 10: ...ESF Framing C 4 Framing Format Conversion C 6 Performance Monitoring C 6 Service and Support...
Страница 22: ...Installation 2 8 FT 100S...
Страница 28: ...Hardware Configuration 3 6 FT100S...
Страница 106: ...Control Port Operation 6 28 FT 100S...
Страница 108: ...Maintenance 7 2 FT 100S...
Страница 116: ...Specifications A 4 FT 100S...
Страница 120: ...Control Port Command Quick Reference B 4 FT 100S...
Страница 128: ...T1 Overview C 8 FT 100S...