
84
Teledyne API N500 CAPS NO
X
Analyzer with NumaView™ Software
089770000 Rev 05
Figure 5-8. Fuse Access
O
3
G
ENERATOR
R
EPLACEMENT
The ozone tower has a printed circuit board attached to its rear and two tubes extending
out the right side in the front of the analyzer (see Figure 2-3). The board has a blue LED
that, when lit, indicates ozone is being generated. To replace the ozone generator:
1. Turn off the analyzer power; remove the power cord and the analyzer cover.
2. Disconnect the 1/8” black tube from the ozone cleanser and the ¼” clear tube from the
plastic extension tube at the brass fitting nearest to the ozone generator.
3. Unplug the electrical connection on the rear side of the brick.
4. Unscrew the two mounting screws that attach the ozone generator to the chassis and
take out the entire assembly.
5. If you received a complete replacement generator with circuit board and mounting
bracket attached, simply reverse the above steps to replace the current generator.
Note
Ensure to carry out a leak check (Section 5.6.5) and a
recalibration after the analyzer has warmed up for about 60
minutes.
Содержание N500
Страница 2: ......