
14
Teledyne API N500 CAPS NO
X
Analyzer with NumaView™ Software
089770000 Rev 05
With no power to the unit, carefully remove the top cover of the instrument and check for
internal shipping damage by carrying out the following steps:
1. Carefully remove the top cover and check for internal shipping damage.
a. Remove the screws located on the instrument’s sides.
b. Slide the cover backward until it clears the instrument’s front bezel.
c. Lift the cover straight up.
2. Inspect the interior of the instrument to ensure all circuit boards and other
components are intact and securely seated.
3. Check the connectors of the various internal wiring harnesses and
pneumatic hoses to ensure they are firmly and securely seated.
4. Verify that all of the optional hardware ordered with the unit has been
installed. These are listed on the paperwork accompanying the instrument.
WARNING – ELECTRICAL SHOCK HAZARD
Never disconnect PCAs, wiring harnesses or electronic
subassemblies while under power.
VENTILATION CLEARANCE
Whether the instrument is set up on a bench or installed in a rack, be sure to leave
sufficient ventilation clearance.
Table 2-1. Ventilation Clearance
AREA
MINIMUM REQUIRED CLEARANCE
Back of the instrument
10 cm / 4 in
Sides of the instrument
2.5 cm / 1 in
Above and below the instrument
2.5 cm / 1 in
Содержание N500
Страница 2: ......