
089770000 Rev 05
Teledyne API N500 CAPS NO
X
Analyzer with NumaView™ Software
83
SERVICE PROCEDURES
This section contains some procedures that may need to be performed when a major
component of the analyzer requires repair or replacement.
Note
Regular maintenance procedures are discussed in Section 5.5
and are not listed here). Also, there may be more detailed service
notes for some of the below procedures. Contact Teledyne API's
WARNING – ELECTRICAL SHOCK HAZARD
Unless the procedure being performed requires the
instrument to be operating, turn it off and disconnect power
before opening the analyzer and removing, adjusting or
repairing any of its components or subsystems.
CAUTION – QUALIFIED TECHNICIAN
The operations outlined in this chapter are to be performed
by qualified maintenance personnel only.
F
USE
R
EPLACEMENT
P
ROCEDURE
ATTENTION
COULD DAMAGE INSTRUMENT AND VOID WARRANTY
Fuses do not typically fail without definite cause. Do not attempt
to replace until after all measures to detect the cause of a power
failure, per Section 5.7.6.1, have been carried out, including Soft
Power switch not blinking, but Hard Power switch is in ON
position and instrument’s power cord properly connected at
both ends. If an ohmmeter shows that the fuse is good, or if a
new fuse blows, call Technical Support (Section 5.9).
WARNING – ELECTRICAL SHOCK HAZARD
Never pull out fuse drawer without ensuring that the Hard
Power switch is in OFF position and power cord
disconnected, to ensure there is no power to the instrument
before checking/changing fuse.
Содержание N500
Страница 2: ......