Section 2 System Preparation
2-11
When you turn the power switch to on, the system will
automatically detect the type of rack, and configure program
settings accordingly. Later, in section 2.11.6, you can configure
the maximum volume for each tube size.
Figure 2-5 Loading test tubes
Figure 2-6 Inserting the collection tube rack
Tube Size
Label