![Telect LTX Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/telect/ltx/ltx_installation-manual_1080058014.webp)
LTX Patch and Splice Panel
Installation Guide
© Telect, Inc. All rights reserved. 148326 12.20.16 v2
1.509.926.6000 :: telect.com
14
The installation instructions apply to the
2RU & 1RU
Refer to
Figure 3-3-
1 & 3-3-2 for this procedure.
Splice trays stack together on the tray platform. Trays
sit in the center platform surrounded by routing spools.
Trays hook together and are secured on the panel with
velcro bands.
1. Attach a velcro zip-tie band at the front and rear
center tie-down slot on the tray platform.
To do this:
a. Slide the band through the tie-down slot
and into the zip-tie opening at the end of
the velcro band.
b. Tighten the band to the slot.
c. Repeat the process at the opposite side,
attaching the velcro band to the platform's
tie-down slot.
2. Place the first splice tray in the center of the platform
(long side of the tray toward the front of the tray
platform) between routing spools, tie-down slots and
metal tabs. There will be a small amount of space
between the metal tabs and tray.
3. Place the next tray on top of the first tray. Each side
of the tray has two tabs that snap into slots securing
it to the tray below. Snap trays together.
4. Repeat Step 3 for the remaining trays.
5. Pull each velcro band up and over the stacked splice
trays and attach them together to secure the trays to
the platform.
*The number of splice trays will depend on the
number of connectors.
Figure 3-3-1 2RU Splice Tray Installation
Figure 3-3-2 1RU Splice Tray Installation