![Telect ADF Скачать руководство пользователя страница 52](http://html.mh-extra.com/html/telect/adf/adf_user-manual_1080063052.webp)
© Telect, Inc., All Rights Reserved, 12.7.16 v.4
1.509.926.6000 :: telect.com
46
User Manual
Advanced Distribution Frame (ADF) Systems
7.
Carefully fit excess cabling into guides, around storage spools and out portal, as shown in Figure 42.
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2010 Telect, Inc., All Rights Reserved, 119736-4
Page 5-46
7. Carefully fit excess cabling into guides, around storage spools, and out portal, as shown in
Figure 42.
o
p
r
q s
n
Figure 42 - Excess Cable Routing
8. When finished with one tray, slide closed the outboard cabling access cover shown in
Figure 41.
9. Now close the next tray above and repeat Steps 3 through 8 until all 900-µm strands from the
riser cable are installed.
10. When finished with an intrafacility cable, re-attach the breakout area cover and swing all ap-
plicable trays to their latched, home (closed) positions.
NOTE:
In general, connect and route all outboard 900-µm strands from the riser cables before
installing any inboard patch cords.
Figure 42 - Excess Cable Routing
8.
When finished with one tray, slide closed the outboard cabling access cover shown in Figure 41.
9. Now close the next tray above and repeat Steps 3 through 8 until all 900-µm strands from the riser cable
are installed.
10.
When finished with an intrafacility cable, reattach the breakout area cover and swing all applicable trays to
their latched, home (closed) positions.
NOTE:
In general, connect and route all outboard 900-µm strands from the riser cables before installing any
inboard patch cords.