![Telect ADF Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/telect/adf/adf_user-manual_1080063029.webp)
© Telect, Inc., All Rights Reserved, 12.7.16 v.4
1.509.926.6000 :: telect.com
23
User Manual
Advanced Distribution Frame (ADF) Systems
2.5 Interconnect - NEs to NEs
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2010 Telect, Inc., All Rights Reserved, 119736-4
Page 2-23
2.5 Interconnect - NEs to NEs
Network Element Patch Cords A
Network Element
Patch Cord B
WaveTrax™ Cable
Management System
Main ADF
InterBay Storage Panel (ISP)
Network Element Modules
Figure 21 - Interconnect - NEs to NEs
Fundamentals of this cross-connect are as follows:
• NE (Network Element) modules (only) are mounted on both sides of the Main ADF bay.
• ISPs (Interbay Storage Panels) are required.
• Back-side NE patch cords come in from the CMS (Cable Management System) into the ISP
and are presented to the back side of the NE modules (Network Element Patch Cords A).
• Front-side NE patch cords are routed into the frame from the CMS and presented to the front
side of the adapter (Network Element Patch Cord B).
Figure 21 - Interconnect - NEs to NEs
Fundamentals of this cross-connect are as follows:
• NE (Network Element) modules (only) are mounted on both sides of the Main ADF bay
• ISPs (Interbay Storage Panels) are required
• Back-side NE patch cords come in from the CMS (Cable Management System) into the ISP and are
presented to the back side of the NE modules (Network Element Patch Cords A)
• Front-side NE patch cords are routed into the frame from the CMS and presented to the front side of the
adapter (Network Element Patch Cord B)